Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 21
Page
... determined by model studies ) Gates : Three , 42 by 30 feet Stilling basin : Reinforced concrete with dentated sills River Outlets Outlets : Two Invert : Elevation 2710.00 Gates : Four , 6 by 7.5 feet ( two are in- stalled in each ...
... determined by model studies ) Gates : Three , 42 by 30 feet Stilling basin : Reinforced concrete with dentated sills River Outlets Outlets : Two Invert : Elevation 2710.00 Gates : Four , 6 by 7.5 feet ( two are in- stalled in each ...
Page 7
... determining physical properties of the undisturbed samples of loess , sands , and shale obtained at various depths ... determined by gravity tests at different depths in several drill holes . Leakage studies indicated that the allu ...
... determining physical properties of the undisturbed samples of loess , sands , and shale obtained at various depths ... determined by gravity tests at different depths in several drill holes . Leakage studies indicated that the allu ...
Page 9
... determined by ramming . steel rod from bottom of jet hole Groundwater elevation at given date . TP4 TPS TP6 E1 27041 EL 2 707 2 140 SILT , fine , sandy SAND , clean SILT , sandy 34 3-40 El 26970 SILT , sandy SAND fine , clean TP7 El ...
... determined by ramming . steel rod from bottom of jet hole Groundwater elevation at given date . TP4 TPS TP6 E1 27041 EL 2 707 2 140 SILT , fine , sandy SAND , clean SILT , sandy 34 3-40 El 26970 SILT , sandy SAND fine , clean TP7 El ...
Page 13
... determine the most economical route . A route through Trenton. R. 32 V Massacre Canyon 00 + 00 2,000 00 + 064 2,000 SCALE OF FEET 4,000 6,000 21 Lingern Canyon BURLINGTON 9150 RESERVOIR DATA Super Storage Flood Storage Conservation ...
... determine the most economical route . A route through Trenton. R. 32 V Massacre Canyon 00 + 00 2,000 00 + 064 2,000 SCALE OF FEET 4,000 6,000 21 Lingern Canyon BURLINGTON 9150 RESERVOIR DATA Super Storage Flood Storage Conservation ...
Page 14
Constructed 1949-1953 United States. Bureau of Reclamation. determine the most economical route . A route through Trenton , Nebr . , was favored by the Bureau of Reclamation . Subsequently , the Bureau of Public Roads in conjunction with ...
Constructed 1949-1953 United States. Bureau of Reclamation. determine the most economical route . A route through Trenton , Nebr . , was favored by the Bureau of Reclamation . Subsequently , the Bureau of Public Roads in conjunction with ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation