Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 10
Page 91
... Labor and materials Pay item Property and pay item description Quantity by contractor Amount Unit Unit cost Total cost 1 Diversion and care of river during construction and unwatering foundations A. Excavate new main diver- sion channel ...
... Labor and materials Pay item Property and pay item description Quantity by contractor Amount Unit Unit cost Total cost 1 Diversion and care of river during construction and unwatering foundations A. Excavate new main diver- sion channel ...
Page 92
... description 5 Excavation , shale for spill- way below elevation 2750 , over 150,000 cubic yards 6 Excavation , other than shale , for spillway below elevation 2750 , first 600,000 cubic yards Labor ... Quantity Amount Unit Unit cost 115,543 ...
... description 5 Excavation , shale for spill- way below elevation 2750 , over 150,000 cubic yards 6 Excavation , other than shale , for spillway below elevation 2750 , first 600,000 cubic yards Labor ... Quantity Amount Unit Unit cost 115,543 ...
Page 93
... description 15 Excavation in south borrow area and transportation to dam ... Labor and materials by contractor Total cost Quantity Amount Unit Unit cost ... Labor and materials by contractor 93.
... description 15 Excavation in south borrow area and transportation to dam ... Labor and materials by contractor Total cost Quantity Amount Unit Unit cost ... Labor and materials by contractor 93.
Page 94
... Labor and materials by contractor Pay item Property and pay item description Quantity Amount Unit Unit cost 28 Crushed rock or gravel blanket on upstream slope of dam embankment Total cost 92,384 cu . yd . 1.00 $ 92,384.00 29 Riprap on ...
... Labor and materials by contractor Pay item Property and pay item description Quantity Amount Unit Unit cost 28 Crushed rock or gravel blanket on upstream slope of dam embankment Total cost 92,384 cu . yd . 1.00 $ 92,384.00 29 Riprap on ...
Page 95
... description 42 Furnishing and laying 12- inch diameter sewer pipe with cemented joints 43 Furnishing and laying 18- inch diameter sewer pipe with cemented joints Labor and materials by contractor Quantity Amount Unit Unit cost Total ...
... description 42 Furnishing and laying 12- inch diameter sewer pipe with cemented joints 43 Furnishing and laying 18- inch diameter sewer pipe with cemented joints Labor and materials by contractor Quantity Amount Unit Unit cost Total ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation