Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 5
Page 30
-244 CoulkingScreen Squore tubular frame Shims -Head and jomb similar Sta 30
* 1800Electric contact goge , Źriver outlet control house only Recording goge not
shown 12 " Pipe for reservoir level recording goge , river outlet Metal storm ...
-244 CoulkingScreen Squore tubular frame Shims -Head and jomb similar Sta 30
* 1800Electric contact goge , Źriver outlet control house only Recording goge not
shown 12 " Pipe for reservoir level recording goge , river outlet Metal storm ...
Page 41
An 8 - foot 2 - inch diameter horseshoe conduit , extending from the emergency
gate chamber to the control house at the downstream edge of the embankment ,
accommodates a 56 - inch inside - diameter steel pipe and a walkway which ...
An 8 - foot 2 - inch diameter horseshoe conduit , extending from the emergency
gate chamber to the control house at the downstream edge of the embankment ,
accommodates a 56 - inch inside - diameter steel pipe and a walkway which ...
Page 42
99.000 N E100,000 N 44000 N. 44.000 -- El . 27600 El 2793.0 El 2760.0 El
27350of Control house Sta 7.40.00 - El 27060 Pipe handrail 2720 Sto . 7. 27.58 T
.42.37 30-01 + 10-09 2725 € Gate chamber Sta 4 + 80.00PT Sto 15 + 15 00 ...
99.000 N E100,000 N 44000 N. 44.000 -- El . 27600 El 2793.0 El 2760.0 El
27350of Control house Sta 7.40.00 - El 27060 Pipe handrail 2720 Sto . 7. 27.58 T
.42.37 30-01 + 10-09 2725 € Gate chamber Sta 4 + 80.00PT Sto 15 + 15 00 ...
Page 51
For design of the control house roof and floors at elevations 2695. 67 and 2708.
17 , the following loadings were used : Concentrated load , lb. Uniform live plus
dead load , lb. per sq . ft . Roof of control house 7,000 110 Floor , elevation ...
For design of the control house roof and floors at elevations 2695. 67 and 2708.
17 , the following loadings were used : Concentrated load , lb. Uniform live plus
dead load , lb. per sq . ft . Roof of control house 7,000 110 Floor , elevation ...
Page 52
An oil hydraulic system is provided for the control of high - pressure gates of the
river outlets and canal outlet works . ... The fan unit draws air through an inlet in
the roof of the control house and discharges it through a duct and discharge head
...
An oil hydraulic system is provided for the control of high - pressure gates of the
river outlets and canal outlet works . ... The fan unit draws air through an inlet in
the roof of the control house and discharges it through a duct and discharge head
...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
1 | |
2 | |
3 | |
4 | |
8 | |
10 | |
12 | |
15 | |
44 | |
45 | |
46 | |
48 | |
50 | |
53 | |
54 | |
60 | |
16 | |
18 | |
22 | |
24 | |
26 | |
28 | |
30 | |
33 | |
35 | |
36 | |
38 | |
39 | |
40 | |
41 | |
42 | |
61 | |
62 | |
64 | |
65 | |
68 | |
70 | |
72 | |
73 | |
77 | |
78 | |
79 | |
80 | |
83 | |
90 | |
101 | |
Other editions - View all
Common terms and phrases
abutment aggregate approximately assumed axis base basin blanket borrow area bottom bridge canal outlet capacity cement channel coating compact completed concrete conduit consisted construction contract contractor control house cost cover Crest cubic cutoff trench designed determining discharge downstream drain drawing Electric elevation embankment excavation extend feet Figure flood floor forms foundation Furnishing gate chamber gote gravel Grout head Highway hoist holes horizontal hydraulic inches indicated inlet installed joints layer length Limits loads located material maximum metal obtained opening operation pipe placed PLAN plate points pounds pressure protective pump railroad reinforcement relocation reservoir water surface riprap River outlet Rolled sand SANO SECTION settlement shale Sheet shown side SILT slope specifications spillway station steel stilling storage stresses structure Sump pump supports tests tion Trenton Dam trucks Unit upstream valve vertical walls weight yards