Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 45
Page
... Concrete overflow chute type with stilling basin Crest length of overflow section : 126 feet Crest : Elevation 2743.00 Maximum discharge : 126 , 500 second- feet at water surface elevation 2785.6 ( as determined by model studies ) Gates ...
... Concrete overflow chute type with stilling basin Crest length of overflow section : 126 feet Crest : Elevation 2743.00 Maximum discharge : 126 , 500 second- feet at water surface elevation 2785.6 ( as determined by model studies ) Gates ...
Page iii
... Concrete 66 66 66 67 67 69 69 71 71 74 74 74 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting D. Gate Installations 58 ...
... Concrete 66 66 66 67 67 69 69 71 71 74 74 74 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting D. Gate Installations 58 ...
Page v
... concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a spillway pier with a crane and bucket 73 377 38 Laboratory technician preparing plastic tubing for installation of ...
... concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a spillway pier with a crane and bucket 73 377 38 Laboratory technician preparing plastic tubing for installation of ...
Page 7
... concrete , tons 96,000 ( 4 ) Riprap For dam , cu . yd . 206,500 For relocated railroad fill , cu . yd . 32,000 ( 5 ) Gravel or crushed rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth ...
... concrete , tons 96,000 ( 4 ) Riprap For dam , cu . yd . 206,500 For relocated railroad fill , cu . yd . 32,000 ( 5 ) Gravel or crushed rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth ...
Page 12
... Concrete Boot Lounching Romp R. 34 W. R. 33 W. 350 + 00 31 RELOCATED HIGHWAY 9750 ABANDONED QUINCY 314 ( ABANDONEET US 34 BURLINGTON AND 315 COUNTY ROAD ABANDONED RELOCATED COUNTY ROAD- 22 23 24 H 32 County Rood Width of R. R 312 Right ...
... Concrete Boot Lounching Romp R. 34 W. R. 33 W. 350 + 00 31 RELOCATED HIGHWAY 9750 ABANDONED QUINCY 314 ( ABANDONEET US 34 BURLINGTON AND 315 COUNTY ROAD ABANDONED RELOCATED COUNTY ROAD- 22 23 24 H 32 County Rood Width of R. R 312 Right ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation