Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 21
Page ii
... Completion work 55 55 55 55 56 56 56 56 57 57 57 5575 CHAPTER V -- CONSTRUCTION 59 42 . River diversion 43 . Construction equipment A. Excavation 59 69 44 . Foundation area 45 . Main cutoff trench 46 . Auxiliary cutoff trench and other ...
... Completion work 55 55 55 55 56 56 56 56 57 57 57 5575 CHAPTER V -- CONSTRUCTION 59 42 . River diversion 43 . Construction equipment A. Excavation 59 69 44 . Foundation area 45 . Main cutoff trench 46 . Auxiliary cutoff trench and other ...
Page iv
... Completed spillway structure viewed from right side of stilling basin 26 12 Spillway gate structure and nonoverflow abutment sections 28 13 Spillway gate structure -- Crest , pier and bridge details 30 14 General installation of 42- by ...
... Completed spillway structure viewed from right side of stilling basin 26 12 Spillway gate structure and nonoverflow abutment sections 28 13 Spillway gate structure -- Crest , pier and bridge details 30 14 General installation of 42- by ...
Page v
... completed to bedrock 62 28 A side - elevating loader in operation in South borrow area 62 20 29 Embankment placing operations 64 30 Dumping riprap rock on an 18 - inch layer of crushed rock blanket 64 31 Panels for forming spillway wall ...
... completed to bedrock 62 28 A side - elevating loader in operation in South borrow area 62 20 29 Embankment placing operations 64 30 Dumping riprap rock on an 18 - inch layer of crushed rock blanket 64 31 Panels for forming spillway wall ...
Page 11
... completed during April 1949. The railroad company approved the relocated line in October 1949 . Final plans and specifications were submitted to the railroad company in April 1950 and approved during June 1950. The selected route is ...
... completed during April 1949. The railroad company approved the relocated line in October 1949 . Final plans and specifications were submitted to the railroad company in April 1950 and approved during June 1950. The selected route is ...
Page 17
... completed to elevation 2760 , and construction of the spillway had advanced to such a stage that it could be used for diversion . PL Sta . 82 + 01 89 N 49,531 76 17 (a) Tailwater computations Economic and other considerations River ...
... completed to elevation 2760 , and construction of the spillway had advanced to such a stage that it could be used for diversion . PL Sta . 82 + 01 89 N 49,531 76 17 (a) Tailwater computations Economic and other considerations River ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation