... capacity : 1,000 second - feet with reservoir water surface eleva- tion at 2720.0 Canal Outlet Works Intake structure : Vertical shaft : 50 feet high Sill elevation : 2710.00 Outlet conduit : 5 feet 6 inches in diam- eter , 208 feet ...
... capacity : 1,000 second - feet with reservoir water surface eleva- tion at 2720.0 Canal Outlet Works Intake structure : Vertical shaft : 50 feet high Sill elevation : 2710.00 Outlet conduit : 5 feet 6 inches in diam- eter , 208 feet ...
Page 1
... capacity of 126 , 500 second- feet , constructed through the left abutment , protects the structure from possible flood damage . A river outlet is provided through the spillway structure for river regulation . At the opposite end of the ...
... capacity of 126 , 500 second- feet , constructed through the left abutment , protects the structure from possible flood damage . A river outlet is provided through the spillway structure for river regulation . At the opposite end of the ...
Page 13
... CAPACITY TABLE CAPACITY ACRES ACRE - FEET 2093 0 O 2694 LO 2696 20 31 2090 56 116 2700 121 292 2702 170 692 2704 302 1,072 2706 412 1700 2700 502 2,780 27100 739 4,101 2716 1,126 0,760 2720 1,672 16,510 2726 2,064 24,800 2730 2,014 ...
... CAPACITY TABLE CAPACITY ACRES ACRE - FEET 2093 0 O 2694 LO 2696 20 31 2090 56 116 2700 121 292 2702 170 692 2704 302 1,072 2706 412 1700 2700 502 2,780 27100 739 4,101 2716 1,126 0,760 2720 1,672 16,510 2726 2,064 24,800 2730 2,014 ...
Page 15
... capacity at maximum water surface elevation 2785.0 133,800 ( initially ) 116,100 ( initially ) 4,100 254,000 107,670 361,670 The limiting water surface elevation of 2797.0 that would cause no property damage was determined for the town ...
... capacity at maximum water surface elevation 2785.0 133,800 ( initially ) 116,100 ( initially ) 4,100 254,000 107,670 361,670 The limiting water surface elevation of 2797.0 that would cause no property damage was determined for the town ...
Page 16
... capacity until the flood control space is filled . " The safe channel capacity has been set at 10,000 c.fs. See Data for Specification Designs , Sept. 17 , 1948 , par 1. 2. 15L . -DISCHARGE - ELEVATION ( Based on Hydraulics Laboratory ...
... capacity until the flood control space is filled . " The safe channel capacity has been set at 10,000 c.fs. See Data for Specification Designs , Sept. 17 , 1948 , par 1. 2. 15L . -DISCHARGE - ELEVATION ( Based on Hydraulics Laboratory ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation