Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 15
Page ii
... Borrow area operation ( a ) South borrow area ( b ) North borrow and spillway areas 61 61 61 8883 63 63 63 Section 48 . 49 . Earth fill placement CONTENTS ( ii.
... Borrow area operation ( a ) South borrow area ( b ) North borrow and spillway areas 61 61 61 8883 63 63 63 Section 48 . 49 . Earth fill placement CONTENTS ( ii.
Page iv
... area 5 Plan of borrow areas and logs of several test holes 6 Railroad and highway relocation around Swanson Lake ( the reservoir formed by Trenton Dam ) * 8 10 127 7 Flood routing curves 16 8 Trenton Dam -- General plan and sections 18 ...
... area 5 Plan of borrow areas and logs of several test holes 6 Railroad and highway relocation around Swanson Lake ( the reservoir formed by Trenton Dam ) * 8 10 127 7 Flood routing curves 16 8 Trenton Dam -- General plan and sections 18 ...
Page v
... area 60 26 Main cutoff trench excavation operations 60 27 Auxiliary cutoff trench excavation completed to bedrock 62 28 A side - elevating loader in operation in South borrow area 62 20 29 Embankment placing operations 64 30 Dumping ...
... area 60 26 Main cutoff trench excavation operations 60 27 Auxiliary cutoff trench excavation completed to bedrock 62 28 A side - elevating loader in operation in South borrow area 62 20 29 Embankment placing operations 64 30 Dumping ...
Page 7
... area south of the canal outlet works for 60 days prior to placement of embankment . This method was feasible because ... borrow area consisted of several separate areas which were designated as N - 1 , N - 2 , N - 3 , and N - 4 . An area ...
... area south of the canal outlet works for 60 days prior to placement of embankment . This method was feasible because ... borrow area consisted of several separate areas which were designated as N - 1 , N - 2 , N - 3 , and N - 4 . An area ...
Page 10
... BORROW AREAS AMBEO AHEID 4320 AH3I9 ANSEI AHSIS AH 3 2020 AHSER AM317 AH 508 150 JHITY AH2OS APPROXIMATE LIMITS OF NORTH ( N - 2 ) BORROW AREA 9710-2000 2005 AH300-24305- AN308 AM330 AMSO AM303 AN304 APPROXIMATE LIMITS OF NORTH IN - 11 ...
... BORROW AREAS AMBEO AHEID 4320 AH3I9 ANSEI AHSIS AH 3 2020 AHSER AM317 AH 508 150 JHITY AH2OS APPROXIMATE LIMITS OF NORTH ( N - 2 ) BORROW AREA 9710-2000 2005 AH300-24305- AN308 AM330 AMSO AM303 AN304 APPROXIMATE LIMITS OF NORTH IN - 11 ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation