Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 28
Page
... blanket on upstream face , seeded topsoil on downstream face Dimensions : Height : 144 feet above lowest ex- cavation in cutoff trench , 100 feet above riverbed Crest length : 8,600 feet Crest elevation : 2793.0 Crest roadway width : 30 ...
... blanket on upstream face , seeded topsoil on downstream face Dimensions : Height : 144 feet above lowest ex- cavation in cutoff trench , 100 feet above riverbed Crest length : 8,600 feet Crest elevation : 2793.0 Crest roadway width : 30 ...
Page i
... blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 7 11 11 11 11 14 བབབ CHAPTER III -- DESIGN Hydraulic requirements 10 . Flood routing ( a ) Tailwater computations ...
... blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 7 11 11 11 11 14 བབབ CHAPTER III -- DESIGN Hydraulic requirements 10 . Flood routing ( a ) Tailwater computations ...
Page v
... blanket 64 31 Panels for forming spillway wall sections 68 33333 32 Form for the 5.5 - foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor ...
... blanket 64 31 Panels for forming spillway wall sections 68 33333 32 Form for the 5.5 - foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor ...
Page 7
... blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth Materials . --The flood plain area was investigated as a possible source of earth materials suitable for construction . The investigations ...
... blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth Materials . --The flood plain area was investigated as a possible source of earth materials suitable for construction . The investigations ...
Page 11
... Blanket Materials.- Several sources for riprap and rock - blan- ket materials were considered . The three most feasible sources were : Franklin , Nebr . , for quartzitic sandstone ; Golden , Colo . , for basalt or granite ; and Guernsey ...
... Blanket Materials.- Several sources for riprap and rock - blan- ket materials were considered . The three most feasible sources were : Franklin , Nebr . , for quartzitic sandstone ; Golden , Colo . , for basalt or granite ; and Guernsey ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation