Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 15
Page 1
... approximately 8 , 600 feet long and rises 144 feet above the lowest point of the excavation . A spillway with a maximum discharge capacity of 126 , 500 second- feet , constructed through the left abutment , protects the structure from ...
... approximately 8 , 600 feet long and rises 144 feet above the lowest point of the excavation . A spillway with a maximum discharge capacity of 126 , 500 second- feet , constructed through the left abutment , protects the structure from ...
Page 4
... DAM FOUNDATION DRAWN 458 SUBMITTED un lley TRACED A RECOMMENDEDI CHECKES APPROVEDE TRENTON , NIER JPY17956 328-720-446 E ON ADMUBINT SIT 3 2793 RR Relocation Approximately 330,000. Geological section at centerline of Trenton Section ...
... DAM FOUNDATION DRAWN 458 SUBMITTED un lley TRACED A RECOMMENDEDI CHECKES APPROVEDE TRENTON , NIER JPY17956 328-720-446 E ON ADMUBINT SIT 3 2793 RR Relocation Approximately 330,000. Geological section at centerline of Trenton Section ...
Page 10
... Approximately 330,000 cubic AMZET AKE ZO AHEED AM230 10,000 AH225 AM284 APPROXIMATE LIMITS OF NORTH IN - 3 ) BORROW AREA --- AHZZZ AM223 ANZEI & Proposed Trenton Dam access rood RR Sta 9696145 yords of material in borrow area el shall ...
... Approximately 330,000 cubic AMZET AKE ZO AHEED AM230 10,000 AH225 AM284 APPROXIMATE LIMITS OF NORTH IN - 3 ) BORROW AREA --- AHZZZ AM223 ANZEI & Proposed Trenton Dam access rood RR Sta 9696145 yords of material in borrow area el shall ...
Page 22
... approximately 750,000 cubic yards of zone 2 material . During later stages of exploratory work and early phases of construction , it became apparent that a much larger quantity ( about 1,100,000 cubic yards ) of zone 2 material would be ...
... approximately 750,000 cubic yards of zone 2 material . During later stages of exploratory work and early phases of construction , it became apparent that a much larger quantity ( about 1,100,000 cubic yards ) of zone 2 material would be ...
Page 37
... approximately 110,000 pounds . The hoists have a maximum lift of 30 feet and a lifting speed of 1.4 feet per minute . 21. Ice Prevention System . - An ice prevention system is provided for an area about 10 feet wide and 160 feet long ...
... approximately 110,000 pounds . The hoists have a maximum lift of 30 feet and a lifting speed of 1.4 feet per minute . 21. Ice Prevention System . - An ice prevention system is provided for an area about 10 feet wide and 160 feet long ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation