Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 11
Page
... Nebraska AERIAL VIEW OF TRENTON DAM SPILLWAY DURING DEDICATION CEREMONIES October. General Information Dam Purpose : Flood ... Nebr . Constructed : 1949-1953 Water supply : Republican River Drainage area : 4,003 square miles Maximum flood ...
... Nebraska AERIAL VIEW OF TRENTON DAM SPILLWAY DURING DEDICATION CEREMONIES October. General Information Dam Purpose : Flood ... Nebr . Constructed : 1949-1953 Water supply : Republican River Drainage area : 4,003 square miles Maximum flood ...
Page 1
... Nebr . The dam is a rolled- earth structure approximately 8 , 600 feet long and rises 144 feet above the lowest ... Nebr . , and Med- icine Creek Dam 8 miles northwest of Cambridge , Nebr . This development plan was outlined in Senate ...
... Nebr . The dam is a rolled- earth structure approximately 8 , 600 feet long and rises 144 feet above the lowest ... Nebr . , and Med- icine Creek Dam 8 miles northwest of Cambridge , Nebr . This development plan was outlined in Senate ...
Page 10
... FRENCHMAN - CAMBRIDGE DIVISION - NEBR . TRENTON DAM " Right of way boundary 2 Hay Canyony STRATTON P SURFACE 34 T. 3 N. 10 Plan of borrow areas and logs of several test holes 27 28 29 30 31 32 33 CONTENTS (Continued)
... FRENCHMAN - CAMBRIDGE DIVISION - NEBR . TRENTON DAM " Right of way boundary 2 Hay Canyony STRATTON P SURFACE 34 T. 3 N. 10 Plan of borrow areas and logs of several test holes 27 28 29 30 31 32 33 CONTENTS (Continued)
Page 11
... Nebr . , for quartzitic sandstone ; Golden , Colo . , for basalt or granite ; and Guernsey , Wyo . , for dolomite . A study of the freight rates , quality , quantity , and production costs indicated that the hard , sound , and durable ...
... Nebr . , for quartzitic sandstone ; Golden , Colo . , for basalt or granite ; and Guernsey , Wyo . , for dolomite . A study of the freight rates , quality , quantity , and production costs indicated that the hard , sound , and durable ...
Page 14
... Nebr . , was favored by the Bureau of Reclamation . Subsequently , the Bureau of Public Roads in conjunction with the State of Nebraska , recommended a route north of the relocated railroad and additional studies were made of the " all ...
... Nebr . , was favored by the Bureau of Reclamation . Subsequently , the Bureau of Public Roads in conjunction with the State of Nebraska , recommended a route north of the relocated railroad and additional studies were made of the " all ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation