... Engineer TECHNICAL RECORD OF DESIGN AND CONSTRUCTION TRENTON DAM Constructed 1949-1953 Meeker - Driftwood Unit Frenchman - Cambridge Division Missouri River Basin Project Denver , Colorado 1957 TRENTON DAM Missouri River Basin Project ...
... Engineer TECHNICAL RECORD OF DESIGN AND CONSTRUCTION TRENTON DAM Constructed 1949-1953 Meeker - Driftwood Unit Frenchman - Cambridge Division Missouri River Basin Project Denver , Colorado 1957 TRENTON DAM Missouri River Basin Project ...
Page
... the Assistant Commissioner and Chief Engineer . Acknowledgment is gratefully made to the designers and field personnel whose contributions formed the basis for this work . CONTENTS CHAPTER I -- INTRODUCTION Section 1 . General description.
... the Assistant Commissioner and Chief Engineer . Acknowledgment is gratefully made to the designers and field personnel whose contributions formed the basis for this work . CONTENTS CHAPTER I -- INTRODUCTION Section 1 . General description.
Page 1
... Engineers , U. S. Army . In July of 1947 , funds were appropriated by Congress for an accelerated flood control program , including a specific appropriation of $ 300,000 for early construction of Culbertson Dam and Reservoir . The names ...
... Engineers , U. S. Army . In July of 1947 , funds were appropriated by Congress for an accelerated flood control program , including a specific appropriation of $ 300,000 for early construction of Culbertson Dam and Reservoir . The names ...
Page 3
... . APPROVED : Mathellan CHIEF ENGINEER DENVER , COLORADO , MAY 3 , 1949 328 - D - 802 Figure 2 .-- Trenton Dam location map . 4 2820 2800 2760 2740 2680 2660 Borrow excavation Crest. 3 Trenton Dam location 25 Title Page.
... . APPROVED : Mathellan CHIEF ENGINEER DENVER , COLORADO , MAY 3 , 1949 328 - D - 802 Figure 2 .-- Trenton Dam location map . 4 2820 2800 2760 2740 2680 2660 Borrow excavation Crest. 3 Trenton Dam location 25 Title Page.
Page 5
... Engineering and inspection Administration and general expense Total indirect costs Total estimated cost 932,989 561,650 1,041,991 584,678 3,121,308 $ 21,351 , 128 5 CHAPTER II -- INVESTIGATIONS 6. General . - Exploration work Cost.
... Engineering and inspection Administration and general expense Total indirect costs Total estimated cost 932,989 561,650 1,041,991 584,678 3,121,308 $ 21,351 , 128 5 CHAPTER II -- INVESTIGATIONS 6. General . - Exploration work Cost.
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation