APPENDIX C (Continued)

Labor and materia Is Pay Property and pay item Quantity by contractor item description Amount Unit Unit cost Total cost Total earnings for specification items, extra work orders, and orders for changes $5,097, 883.03 Amendatory agreement 490,000.00 Wage differential for iron workers 13,686. 23 Less materials wasted or used by contractor Portland-Pozzolan Cement 1,848.78 bbl. 3.63 6, 711.07 Freight on coarse aggregate 397.98 Ton 2.70 1,074. 55 Freight on coarse aggregate 811. 31 Ton 2.81 2,279.78 Freight on coarse aggregate 5, 010. 44 Ton 2.87 14, 379.96 Crushed rock blanket used as coarse aggregate 53 Ton 1.15 60.95 Crushed rock blanket used as 3" gravel blanket in spillway 386 Ton 1.15 443. 90 Freight differential on concrete aggregate Guernsey, Wyo. and Denver Colo. 1,244. 18 Ton 0.2226 276.95 Asphalt, RCS-1 150 gal. 0.11 16.50 Asphalt, RCS-1 75 gal. 0.1527 11.45 Riprap 370. 5 Ton 4.00 1,482.00 Crushed rock blanket 1, 179.9 Ton 3.56 4, 200. 44 Total $5,570,631.71 Cost of test installations:

APPENDIX D

Embankment

Piezometer and foundation system settlement (25 tips) apparatus Equipment $ 256.05 $ 440.00 Materials 358. 14 431. 95 Labor and survey 1,488. 21 3, 690.00

Terminal well construction 618.86 -

TOTAL $2,721. 26 $4,561. 95

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small]

APPENDIX F.

Design criteria:

The stability factors and loadings used in the design of the spillway and outlet works were as follows:

[blocks in formation]

Weight of dry earth fill 120 lb. per cu. ft.
130 (for conduits, spillway inlet walls)

Weight of saturated

earth fill 135 lb. per cu. ft. Horizontal dry earth- 40 lb. per cu. ft.

fill load 1/ 43 (for conduits and spillway

inlet walls)

Horizontal saturated

earth-fill load 1/ 75 lb. per cu. ft. Weight of water 62.5 lb. per cu. ft. . Weight of concrete 150 lb. per cu. ft.

I] By equivalent fluid pressure theory

Design of all concrete structures was based on concrete of 3,000 pounds per square inch compressive strength at 28 days and a modular ratio of 10. Allowable working stresses in pounds per square inch for all concrete structures except pressure and horseshoe conduits, for which other steel tension and concrete compressive stresses were used under certain loading conditions, are indicated below:

[ocr errors][merged small][ocr errors]

Allowable steel tension and concrete compressive stresses in pounds per square inch for conduits are as follows:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]
[ocr errors]

feet on centerline of conduit)

40,000

40,000