Tabulation of right-of-way acquired by Buras levee district for construction of Uuited States levees under Flood Control Act of 1928-Continued PLAQUEMINES PARISH-Continued United States, Kamlah-Henderson, new United States Upper Orange Farm, New Levee: 1 Amounts not paid. 3 Partial payment. Not assessed. Mr. JACOBS. There is one other point I would like to bring out to you, and which was referred to the other day, and that is that in the State of Louisiana of these districts that we have the upper one from the Arkansas line south is the Fifth Louisiana Levee District, and it shows here in black the work that has been done on the west bank. That levee line extends down to Point Breeze. On the south, the Old River, on the Mississippi River at this point, on the old river to the Gulf we have levee lines on both sides of the river [indicating]. The upper stretch of the river is not settled along the river line. All of the inhabitants, homes, and settlements and towns are from 6 to 10 or 15 miles back from the river. South of Old River, all of the improvements are right along the river. From there down to Baton Rouge to Plaquemine, Donaldsonville, and New Orleans, all of the imrpovements here along the river, since 1928, every one of those houses has been moved, all of the improvements have been destroyed, the levees have been destroyed and the main highways paralleling the river line. Now, I have included the cost of each of those districts, the cost of that work on the river in this report which I submit to you. The CHAIRMAN. That is included in your report? Mr. JACOBS. Yes; and I would like to just request, when the committee is deliberating on this question, that those districts be given consideration. The CHAIRMAN. We will be glad to do that, Mr. Jacobs. Thank you very much for your statement. Mr. JACOBS. I have with me also a copy of the statement of highway reallocations on account of levee changes since the enactment of the Flood Control Act of May 15, 1928, and with your permission I would like to file that statement. The CHAIRMAN. Yes, you will be given that permission. (The report is as follows:) Highway relocations account levee changes since the enactment of the Flood Contro Act of May 15, 1928 ATCHAFALAYA LEVEE DISTRICT Project Page Parish Name of highway Bayou Plaquemine. F. China Grove. Waterloo-Hermitage. Arbroth-Alford. Chamberlin-Lobdell. Highway relocations account levee changes since the enactment of the Flood Control Act of May 15, 1928-Continued Lauderdale, new levee. Brookstown, new levee. Richard Plant-Salbury. Winchester Levee. Pikes Peak, new levee. Lower Bonnet Carre Levee. Waguespack, new levee no. 2. Waterford, new levee. Star Levee. Winchester, new levee. Waguespack, new levee no. 3. Carroll, new levee. Columbia, new levee. Stella, new levee. Highway relocations account levee changes since the enactment of the Flood Control Act of May 15, 1928-Continued Project Page PONTCHARTRAIN LEVEE DISTRICT Parish Name of highway Gay, new levee. Willow Grove, new levee. Lower Reserve A, new levee. Belle Helene-Geismer. Granada, new levee. Plaquemine Point, new levee. Dicharry Levee. Goodhope, new levee. Ormonde, new levee. Kenner, North. Oak Street levee road. Cost of projects in Barataria Levee District Bayou Plaquemine Highway (project A-10, length 1.5 miles, Total cost of project... $37.50 12, 957. 56 Keller Levee Highway (project A-11-E, length 0.30 miles, con- Engineering surveys and supervision. Total cost of project_ $73. 68 $12,995. 06 792. 62 1, 061. 90 585. 10 2, 513. 30 F. China Grove Highway (project A-11-F, length 0.682 mile, Contract payments--- Engineering surveys and supervision___. Total cost of project... $1, 088. 01 3,056. 88 435. 56 4, 580. 45 Legonier New Levee Highway (project A-13, length 0.180 mile, Engineering surveys and supervision_.. Total cost of project... $252.00 743. 25 40. 40 1,035. 65 Evans Point, new levee highway (project A-15, length 0.928 mile, New Texas, new levee highway (project A-16, length 0.570 mile, St. Francisville, new levee highway (project A-17, length 0.750 mile, constructed by Young & Debretton in Atchafalaya levee distric, Pointe Coupee Parish, under contract executed Dec. 6, 1928: Right-of-way and miscellaneous expenses.. Engineering surveys and supervision. Total cost of project-- $102. 17 2, 281. 33 19, 617. 26 1, 211. 28 23, 212. 04 |