Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 8
Page 11
... truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad , Highway , and County Road Relocation Studies . - ( a ) Railroad . -- Relocation studies for the Chicago , Burlington and Quincy Railroad were started in 1947 . These ...
... truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad , Highway , and County Road Relocation Studies . - ( a ) Railroad . -- Relocation studies for the Chicago , Burlington and Quincy Railroad were started in 1947 . These ...
Page 55
... truck overturning . ( 2 ) A steel bin falling on a welder . ( 3 ) A carpenter falling from a high form . A. Contracts 37 . - Major Construction Contracts . The construction of Trenton Dam and re- location of railroad and highway was ...
... truck overturning . ( 2 ) A steel bin falling on a welder . ( 3 ) A carpenter falling from a high form . A. Contracts 37 . - Major Construction Contracts . The construction of Trenton Dam and re- location of railroad and highway was ...
Page 59
... Trucks Flatbed trucks Dump trucks Truck End - dump trucks End - dump trucks Bottom - dump trucks Bottom - dump trucks Water tank trucks Transit mixer trucks Fuel tank trailers Tractors Excavating machine Shop cranes Scrapers Motor ...
... Trucks Flatbed trucks Dump trucks Truck End - dump trucks End - dump trucks Bottom - dump trucks Bottom - dump trucks Water tank trucks Transit mixer trucks Fuel tank trailers Tractors Excavating machine Shop cranes Scrapers Motor ...
Page 62
... 1951 . Figure 28. --A side - elevating loader in operation in South borrow area . Excavated material is being loaded on a 30 - cubic - yard truck . P328-701-2801 , June 12 , 1951 . ground - water table . The pumps handled an average. 62.
... 1951 . Figure 28. --A side - elevating loader in operation in South borrow area . Excavated material is being loaded on a 30 - cubic - yard truck . P328-701-2801 , June 12 , 1951 . ground - water table . The pumps handled an average. 62.
Page 63
... trucks , having capacities ranging from 13 to 17 cubic yards . Fine sand and silt were the principal constituents of the excavated material . The dragline and shovel method of excavating yielded a satisfactory mixture . During the ...
... trucks , having capacities ranging from 13 to 17 cubic yards . Fine sand and silt were the principal constituents of the excavated material . The dragline and shovel method of excavating yielded a satisfactory mixture . During the ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost