Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 18
Page
... supply : Republican River Drainage area : 4,003 square miles Maximum flood : 200,000 second- feet ( May 31 , 1935 ) Average yearly flow : 211 second- feet ( 1947-1952 ) Reservoir : Official name : Swanson Lake Area : 7,975 acres at ...
... supply : Republican River Drainage area : 4,003 square miles Maximum flood : 200,000 second- feet ( May 31 , 1935 ) Average yearly flow : 211 second- feet ( 1947-1952 ) Reservoir : Official name : Swanson Lake Area : 7,975 acres at ...
Page ii
... supply contracts Housing ( a ) Houses ( b ) Pipe for water and sewer facilities 55 56 56 56 56 57 57 57 40 . 41 . Caretaker's facilities 57 Reservoir clearing 57 CHAPTER V -- CONSTRUCTION 42 . River diversion 43 . Construction equipment ...
... supply contracts Housing ( a ) Houses ( b ) Pipe for water and sewer facilities 55 56 56 56 56 57 57 57 40 . 41 . Caretaker's facilities 57 Reservoir clearing 57 CHAPTER V -- CONSTRUCTION 42 . River diversion 43 . Construction equipment ...
Page 5
... supply contracts Minor supply contracts Other Government - furnished materials 4,299 898,996 133,991 2,263 , 333 2,997,568 51,176 214,072 854 , 156 10,812 , 229 Total direct costs Indirect Costs Preliminary surveys and investigations ...
... supply contracts Minor supply contracts Other Government - furnished materials 4,299 898,996 133,991 2,263 , 333 2,997,568 51,176 214,072 854 , 156 10,812 , 229 Total direct costs Indirect Costs Preliminary surveys and investigations ...
Page 15
... supply wells and sew- age treatment plant against pollution or damage when this water surface is reached . A maximum allowable reservoir water surface elevation of 2785.0 was established by allow- ing 12 feet below the limiting ...
... supply wells and sew- age treatment plant against pollution or damage when this water surface is reached . A maximum allowable reservoir water surface elevation of 2785.0 was established by allow- ing 12 feet below the limiting ...
Page 30
... supply header Grout return header 24 Min Apply protective coating to freshly exposed excavated surfaces where directed-- El 2690 -Type 2 metal sealing strip to follow excavation line as closely as possible Formed drain SECTIONAL ...
... supply header Grout return header 24 Min Apply protective coating to freshly exposed excavated surfaces where directed-- El 2690 -Type 2 metal sealing strip to follow excavation line as closely as possible Formed drain SECTIONAL ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost