Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 27
Page
... side slopes , length about 6 , 760 feet Auxiliary cutoff trench : 50 - foot base width with 1-1 / 2 to 1 side slopes , length about 570 feet Spillway Type : Concrete overflow chute type with stilling basin Crest length of overflow ...
... side slopes , length about 6 , 760 feet Auxiliary cutoff trench : 50 - foot base width with 1-1 / 2 to 1 side slopes , length about 570 feet Spillway Type : Concrete overflow chute type with stilling basin Crest length of overflow ...
Page iv
... side of stilling basin 26 12 Spillway gate structure and nonoverflow abutment sections 28 13 Spillway gate structure -- Crest , pier and bridge details 30 14 General installation of 42- by 30 - foot radial gate for spillway 35 15 ...
... side of stilling basin 26 12 Spillway gate structure and nonoverflow abutment sections 28 13 Spillway gate structure -- Crest , pier and bridge details 30 14 General installation of 42- by 30 - foot radial gate for spillway 35 15 ...
Page v
... side - elevating loader in operation in South borrow area 62 29 Embankment placing operations 64 30 Dumping riprap rock on an 18 - inch layer of crushed rock blanket 64 33 33 33 31 Panels for forming spillway wall sections 68 32 Form ...
... side - elevating loader in operation in South borrow area 62 29 Embankment placing operations 64 30 Dumping riprap rock on an 18 - inch layer of crushed rock blanket 64 33 33 33 31 Panels for forming spillway wall sections 68 32 Form ...
Page 17
... sides of the spillway structure , which would permit the embankment to be constructed to a low elevation at the spillway ... side slopes and sufficient width to permit the passage of the 10 - year flood without flooding the railroad or ...
... sides of the spillway structure , which would permit the embankment to be constructed to a low elevation at the spillway ... side slopes and sufficient width to permit the passage of the 10 - year flood without flooding the railroad or ...
Page 18
... Side slope contours Sta . 27 + 37 73 County road --- 6 : 1 Cutoff trench Paved gutter , see 328 - D - 1446 for " Toe drain typical sections * 2750- 2750- + 2725- 2775- 565 ° 00'E Approx limits of riprap --- Limits of upstream blanket ...
... Side slope contours Sta . 27 + 37 73 County road --- 6 : 1 Cutoff trench Paved gutter , see 328 - D - 1446 for " Toe drain typical sections * 2750- 2750- + 2725- 2775- 565 ° 00'E Approx limits of riprap --- Limits of upstream blanket ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost