Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 30
Page i
... rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 11 11 11 11 14 CHAPTER III -- DESIGN 9 . Hydraulic requirements 15 10 . Flood routing 15 ( a ) Tailwater ...
... rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 11 11 11 11 14 CHAPTER III -- DESIGN 9 . Hydraulic requirements 15 10 . Flood routing 15 ( a ) Tailwater ...
Page iii
... rock and riprap placement 635 65 65 66 C. Concrete 50 . Materials ( a ) Sand 66 66 ( b ) Coarse aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) ...
... rock and riprap placement 635 65 65 66 C. Concrete 50 . Materials ( a ) Sand 66 66 ( b ) Coarse aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) ...
Page v
... rock on an 18 - inch layer of crushed rock blanket 64 33 33 33 31 Panels for forming spillway wall sections 68 32 Form for the 5.5 - foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading ...
... rock on an 18 - inch layer of crushed rock blanket 64 33 33 33 31 Panels for forming spillway wall sections 68 32 Form for the 5.5 - foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading ...
Page 7
... rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth Materials . -- The flood plain area was investigated as a possible source of earth materials suitable for construction . The ...
... rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth Materials . -- The flood plain area was investigated as a possible source of earth materials suitable for construction . The ...
Page 11
... rock - blanket of the dam . Rock obtained from the Golden quarry required blasting and processing at the quarry , shipment by railroad to Trenton , Nebr . , and haul- ing by truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad ...
... rock - blanket of the dam . Rock obtained from the Golden quarry required blasting and processing at the quarry , shipment by railroad to Trenton , Nebr . , and haul- ing by truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost