Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 20
Page
... River Outlets Outlets : Two Invert : Elevation 2710.00 Gates : Four , 6 by 7.5 feet ( two are in- stalled in each outlet ) Discharge capacity : 1,000 second - feet with reservoir water surface eleva- tion at 2720.0 Canal Outlet Works ...
... River Outlets Outlets : Two Invert : Elevation 2710.00 Gates : Four , 6 by 7.5 feet ( two are in- stalled in each outlet ) Discharge capacity : 1,000 second - feet with reservoir water surface eleva- tion at 2720.0 Canal Outlet Works ...
Page
... river outlets , canal outlet works , and railroad structures are included in chapter III . Chapter IV contains discussions on contract administration and survey work . All phases of construction are discussed in chapter V. Chapter VI is ...
... river outlets , canal outlet works , and railroad structures are included in chapter III . Chapter IV contains discussions on contract administration and survey work . All phases of construction are discussed in chapter V. Chapter VI is ...
Page i
... River Outlets 15 . General 16 . Abutment structure 17 . Gate and bridge supporting structure 225 23 27 27 ( a ) ... River outlet trashracks 39 24 . High - pressure gates 39 D. Canal Outlet Works 25 . General 26. Intake structure 41 41 ...
... River Outlets 15 . General 16 . Abutment structure 17 . Gate and bridge supporting structure 225 23 27 27 ( a ) ... River outlet trashracks 39 24 . High - pressure gates 39 D. Canal Outlet Works 25 . General 26. Intake structure 41 41 ...
Page 17
... river outlets with the spillway in place of the construction of a separate river outlet works . In each of the schemes investigated , full consideration was given to the safety of the project , the geological limitations of the site ...
... river outlets with the spillway in place of the construction of a separate river outlet works . In each of the schemes investigated , full consideration was given to the safety of the project , the geological limitations of the site ...
Page 21
... River Outlets 2 14 500 600 700 Nor . S. ET 2752.0 120,60 4.6 . Min . ws.E , 2710.0 4,101 3 CANAL OUTLET DISCHARGE - HUNDREDS OF CFS 2 4 5 6 7 30 90 SPILLWAY - DISCHARGE RIVER OUTLETS DISCHARGE - THOUSANDS OF C.F.S. 60 120 150 THOUSANDS ...
... River Outlets 2 14 500 600 700 Nor . S. ET 2752.0 120,60 4.6 . Min . ws.E , 2710.0 4,101 3 CANAL OUTLET DISCHARGE - HUNDREDS OF CFS 2 4 5 6 7 30 90 SPILLWAY - DISCHARGE RIVER OUTLETS DISCHARGE - THOUSANDS OF C.F.S. 60 120 150 THOUSANDS ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost