Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 38
Page i
... ( a ) Design stresses Ice prevention system 34 34 34 34 37 37 37 23 . River outlet trashracks 39 24 . High - pressure gates 39 D. Canal Outlet Works 25 . General 26. Intake structure 41 41 Section CONTENTS ( Continued ) 27 . 28 . 29 i.
... ( a ) Design stresses Ice prevention system 34 34 34 34 37 37 37 23 . River outlet trashracks 39 24 . High - pressure gates 39 D. Canal Outlet Works 25 . General 26. Intake structure 41 41 Section CONTENTS ( Continued ) 27 . 28 . 29 i.
Page ii
... Pressure conduit ( a ) Loadings Emergency gate chamber Horseshoe conduit ( a ) Loadings ( b ) Design considerations Outlet pipe Control house and stilling well ( a ) Design considerations High - pressure gates Miscellaneous equipment E ...
... Pressure conduit ( a ) Loadings Emergency gate chamber Horseshoe conduit ( a ) Loadings ( b ) Design considerations Outlet pipe Control house and stilling well ( a ) Design considerations High - pressure gates Miscellaneous equipment E ...
Page iii
... pressure gates 75 59 . Radial gates 75 ( a ) Painting 75 CHAPTER VI --- TEST INSTALLATIONS 60 . Purpose 61 . Piezometer installation 62. Settlement installations 22223 77 77 82 APPENDIXES 83 A. Cost summary B. Pay item breakdown for ...
... pressure gates 75 59 . Radial gates 75 ( a ) Painting 75 CHAPTER VI --- TEST INSTALLATIONS 60 . Purpose 61 . Piezometer installation 62. Settlement installations 22223 77 77 82 APPENDIXES 83 A. Cost summary B. Pay item breakdown for ...
Page iv
... pressure gate 40 18 Canal outlet works-- Plan and sections 42 19 Canal outlet works discharge curves 44 20 Pressure conduit of canal outlet works -- Compacting backfill around conduit 45 22 21 Canal outlet works -- Gate chambers and ...
... pressure gate 40 18 Canal outlet works-- Plan and sections 42 19 Canal outlet works discharge curves 44 20 Pressure conduit of canal outlet works -- Compacting backfill around conduit 45 22 21 Canal outlet works -- Gate chambers and ...
Page 5
... pressures develop after application of a load . 5. Cost . The following tabulation gives the cost of construction of Trenton Dam and Reservoir and the railroad and highway relocations , by major groupings , as of August 28 , 1957. A ...
... pressures develop after application of a load . 5. Cost . The following tabulation gives the cost of construction of Trenton Dam and Reservoir and the railroad and highway relocations , by major groupings , as of August 28 , 1957. A ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost