Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 6
Page 57
... pozzolan 3812 Willamette Iron and Steel Co. , $ 22,750 Portland , Oregon 3002 Keyes Tank Co. , Provo , Utah Several suppliers Several suppliers 6 , 173 231 , 238 92,400 3080 Ash Grove Lime 293 , 190 cement for Trenton Dam and Portland ...
... pozzolan 3812 Willamette Iron and Steel Co. , $ 22,750 Portland , Oregon 3002 Keyes Tank Co. , Provo , Utah Several suppliers Several suppliers 6 , 173 231 , 238 92,400 3080 Ash Grove Lime 293 , 190 cement for Trenton Dam and Portland ...
Page 67
... pozzolan and portland cement , manufactured at the Louisville , Nebr . , plant of the Ash Grove Lime and Portland Cement Co. , was low - alkali type and conformed to Federal specifications No. SS - C - 192 . As soon as the portland - ...
... pozzolan and portland cement , manufactured at the Louisville , Nebr . , plant of the Ash Grove Lime and Portland Cement Co. , was low - alkali type and conformed to Federal specifications No. SS - C - 192 . As soon as the portland - ...
Page 72
... POZZOLAN AUG '51 3 - inch maximum aggregate , W / C = 0. $ 5 AVG 27 24 24 25 | 72 312 0.55 2.90 145.0 236 428 25 % 879 2376 5.0 2511 3439 3961 4068 MAX 88 0.57 3.00 146.5 6.3 3183 3891 MIN 53 0.53 2.50 143.2 4.4 2140 3183 AUG '52 3 ...
... POZZOLAN AUG '51 3 - inch maximum aggregate , W / C = 0. $ 5 AVG 27 24 24 25 | 72 312 0.55 2.90 145.0 236 428 25 % 879 2376 5.0 2511 3439 3961 4068 MAX 88 0.57 3.00 146.5 6.3 3183 3891 MIN 53 0.53 2.50 143.2 4.4 2140 3183 AUG '52 3 ...
Page 85
... pozzolan cement -- Ash Grove , contract 12r- 19083 High pressure gates for spillway river outlets -- Hardie- Tines Mfg . Co. , contract I2r - 19238 Structural steel for underpass on relocated C. B. & Q. Railroad -- American Bridge Co ...
... pozzolan cement -- Ash Grove , contract 12r- 19083 High pressure gates for spillway river outlets -- Hardie- Tines Mfg . Co. , contract I2r - 19238 Structural steel for underpass on relocated C. B. & Q. Railroad -- American Bridge Co ...
Page 99
... pozzolan and the in- crease in proportion to pozzolan ( b ) For the increase in cost of the work resulting from Total cost Lump 100 % sum 1,800 $ 1,800.00 Lump 100 % sum 1,920 1,920.00 Lump 100 % sum 1,170 1,170.00 Lump 100 % sum 273 ...
... pozzolan and the in- crease in proportion to pozzolan ( b ) For the increase in cost of the work resulting from Total cost Lump 100 % sum 1,800 $ 1,800.00 Lump 100 % sum 1,920 1,920.00 Lump 100 % sum 1,170 1,170.00 Lump 100 % sum 273 ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost