Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 9
Page
... included in chapter III . Chapter IV contains discussions on contract administration and survey work . All phases of construction are discussed in chapter V. Chapter VI is devoted to test installations . This technical record was ...
... included in chapter III . Chapter IV contains discussions on contract administration and survey work . All phases of construction are discussed in chapter V. Chapter VI is devoted to test installations . This technical record was ...
Page 7
... N - 1 , N - 2 , N - 3 , and N - 4 . An area which included a portion of ELEVATION IN FEET ELEVATION IN PEET E. 100,000 CHT DHIDHS- 7 CHAPTER II--INVESTIGATIONS General Construction materials (a) Earth materials Page 11115.
... N - 1 , N - 2 , N - 3 , and N - 4 . An area which included a portion of ELEVATION IN FEET ELEVATION IN PEET E. 100,000 CHT DHIDHS- 7 CHAPTER II--INVESTIGATIONS General Construction materials (a) Earth materials Page 11115.
Page 11
... included several routes having a combined length of 62 miles . The railroad company provided data and assisted in the selection of the route . Some of the studies for the relocation work included : ( 1 ) Cost estimates for raising the ...
... included several routes having a combined length of 62 miles . The railroad company provided data and assisted in the selection of the route . Some of the studies for the relocation work included : ( 1 ) Cost estimates for raising the ...
Page 32
... included reactions from gate loadings at various stages of operation together with a hydrostatic loading on the pier , and a differential loading produced by one gate open and the adjacent gate closed . Reinforcement for the river ...
... included reactions from gate loadings at various stages of operation together with a hydrostatic loading on the pier , and a differential loading produced by one gate open and the adjacent gate closed . Reinforcement for the river ...
Page 53
... included tests on concrete materials and placements , inspection at mixing plants , and tests of earth materials during excava- tion and embankment placement . Laboratory forces supervised and assisted in installa- tion of technical ...
... included tests on concrete materials and placements , inspection at mixing plants , and tests of earth materials during excava- tion and embankment placement . Laboratory forces supervised and assisted in installa- tion of technical ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost