Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 16
Page
... Flood control , diversion for irrigation , storage , sedimentation control , fish and wildlife preserva- tion , and recreation Location : On Republican River , about 2-1 / 2 miles west of Trenton , Nebr . Constructed : 1949-1953 Water ...
... Flood control , diversion for irrigation , storage , sedimentation control , fish and wildlife preserva- tion , and recreation Location : On Republican River , about 2-1 / 2 miles west of Trenton , Nebr . Constructed : 1949-1953 Water ...
Page iv
... Flood routing curves 16 8 Trenton Dam -- General plan and sections 18 9 ... control arrangement 38 17 Assembly and list of parts for 6- by 7-1 / 2 ... Control house and stilling well for canal outlet works 48 Canal outlet works -- Gate ...
... Flood routing curves 16 8 Trenton Dam -- General plan and sections 18 9 ... control arrangement 38 17 Assembly and list of parts for 6- by 7-1 / 2 ... Control house and stilling well for canal outlet works 48 Canal outlet works -- Gate ...
Page 1
... flood control features of the Missouri River Basin project . Among the benefits derived from the construction of Trenton Dam are flood control , diversion for irrigation , storage , sedimentation control , fish and wildlife preservation ...
... flood control features of the Missouri River Basin project . Among the benefits derived from the construction of Trenton Dam are flood control , diversion for irrigation , storage , sedimentation control , fish and wildlife preservation ...
Page 15
... flood control regulations of the Flood Control Act dated December 22 , 1944 , and field working agreement between the Bureau of Reclamation and the Corps of Engineers dated October 26 , 1954 , capacities for dead storage , irrigation ...
... flood control regulations of the Flood Control Act dated December 22 , 1944 , and field working agreement between the Bureau of Reclamation and the Corps of Engineers dated October 26 , 1954 , capacities for dead storage , irrigation ...
Page 16
... FLOOD CONTROL STORAGE SPACE FILLED 189 , 700 A , F OUTFLOW - TIME- 20 TIME IN HOURS TOP OF FLOOD CONTROL POOL EL . 2773.0 MAX . DISCHARGE 129,500 C.F.S. NOTES The discharge - elevation curve is based on automatic hydraulic operation for ...
... FLOOD CONTROL STORAGE SPACE FILLED 189 , 700 A , F OUTFLOW - TIME- 20 TIME IN HOURS TOP OF FLOOD CONTROL POOL EL . 2773.0 MAX . DISCHARGE 129,500 C.F.S. NOTES The discharge - elevation curve is based on automatic hydraulic operation for ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost