Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 20
Page
... flood : 200,000 second- feet ( May 31 , 1935 ) Average yearly flow : 211 second- feet ( 1947-1952 ) Reservoir : Official name : Swanson Lake Area : 7,975 acres at elevation 2773.0 Flood control storage : 133,800 acre - feet , between ...
... flood : 200,000 second- feet ( May 31 , 1935 ) Average yearly flow : 211 second- feet ( 1947-1952 ) Reservoir : Official name : Swanson Lake Area : 7,975 acres at elevation 2773.0 Flood control storage : 133,800 acre - feet , between ...
Page i
... Flood routing 15 ( a ) Tailwater computations 17 11 . Economic and other considerations 17 12 . River diversion plan 17 A. Arrangement of Structures 13. General 22 B. Dam 14 . Embankment ( a ) Upstream slope ( b ) Downstream slope ( c ) ...
... Flood routing 15 ( a ) Tailwater computations 17 11 . Economic and other considerations 17 12 . River diversion plan 17 A. Arrangement of Structures 13. General 22 B. Dam 14 . Embankment ( a ) Upstream slope ( b ) Downstream slope ( c ) ...
Page iv
... Flood routing curves 16 8 Trenton Dam -- General plan and sections 18 9 Spillway plan and sections 24 10 Downstream face of overflow section of spillway structure and spillway gates 26 11 Completed spillway structure viewed from right ...
... Flood routing curves 16 8 Trenton Dam -- General plan and sections 18 9 Spillway plan and sections 24 10 Downstream face of overflow section of spillway structure and spillway gates 26 11 Completed spillway structure viewed from right ...
Page 1
... flood control features of the Missouri River Basin project . Among the benefits derived from the construction of Trenton Dam are flood control , diversion for irrigation , storage , sedimentation control , fish and wildlife preservation ...
... flood control features of the Missouri River Basin project . Among the benefits derived from the construction of Trenton Dam are flood control , diversion for irrigation , storage , sedimentation control , fish and wildlife preservation ...
Page 7
... flooding separate sections of the dam foundation by basins and ditches in the abutment . 7 . Construction Materials . - It was ... flood plain area was investigated as a possible source of earth materials suitable for construction . The ...
... flooding separate sections of the dam foundation by basins and ditches in the abutment . 7 . Construction Materials . - It was ... flood plain area was investigated as a possible source of earth materials suitable for construction . The ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost