Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 48
Page
... elevation 2773.0 Flood control storage : 133,800 acre - feet , between elevations 2752.0 and 2773.0 Active ... elevation : 2793.0 Crest roadway width : 30 feet Volume : 7,800,000 cubic yards Slopes : Upstream , 6 to 1 to ele- vation 2710 ...
... elevation 2773.0 Flood control storage : 133,800 acre - feet , between elevations 2752.0 and 2773.0 Active ... elevation : 2793.0 Crest roadway width : 30 feet Volume : 7,800,000 cubic yards Slopes : Upstream , 6 to 1 to ele- vation 2710 ...
Page 3
... KBIJENU . RECOMMENDED Malder . KN . Mollellan APPROVED : .... CHIEF ENGINEER DENVER , COLORADO , MAY 3 , 1949 328 - D - 802 Figure 2 .-- Trenton Dam location map . 4 ELEVATIONS 2760 Loess Fine sandy silt Left Abutment 2720. 3.
... KBIJENU . RECOMMENDED Malder . KN . Mollellan APPROVED : .... CHIEF ENGINEER DENVER , COLORADO , MAY 3 , 1949 328 - D - 802 Figure 2 .-- Trenton Dam location map . 4 ELEVATIONS 2760 Loess Fine sandy silt Left Abutment 2720. 3.
Page 4
... ELEVATIONS 2760 Loess Fine sandy silt Left Abutment 2720 Silty sand Ogallala sediments Clean sand - Partially cemented 2700 2640 100 90 80 TO Alluvium Fine to coarse sand 60 STATIONS End of Cutoff Trench- Loess with alluvial silt and ...
... ELEVATIONS 2760 Loess Fine sandy silt Left Abutment 2720 Silty sand Ogallala sediments Clean sand - Partially cemented 2700 2640 100 90 80 TO Alluvium Fine to coarse sand 60 STATIONS End of Cutoff Trench- Loess with alluvial silt and ...
Page 7
... ELEVATION IN FEET ELEVATION IN PEET E. 100,000 CHT DHIDHS- 7 CHAPTER II--INVESTIGATIONS General Construction materials (a) Earth materials Page 11115.
... ELEVATION IN FEET ELEVATION IN PEET E. 100,000 CHT DHIDHS- 7 CHAPTER II--INVESTIGATIONS General Construction materials (a) Earth materials Page 11115.
Page 8
Constructed 1949-1953 United States. Bureau of Reclamation. ELEVATION IN FEET ELEVATION IN PEET E. 100,000 CHT DHIDHS- CH22 CH20 CH27 x24 JH135 JH145 JHI46 CHIS E. 99,000 CHIT 2800 2750 · JH31 JHI20 JH144 JHM42 OJH143 HI19 JHI30 1695 ...
Constructed 1949-1953 United States. Bureau of Reclamation. ELEVATION IN FEET ELEVATION IN PEET E. 100,000 CHT DHIDHS- CH22 CH20 CH27 x24 JH135 JH145 JHI46 CHIS E. 99,000 CHIT 2800 2750 · JH31 JHI20 JH144 JHM42 OJH143 HI19 JHI30 1695 ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost