Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 21
Page
... earth fill Foundation : Pierre shale Slope protection : Riprap on gravel blanket on upstream face , seeded topsoil on downstream face Dimensions : Height : 144 feet above lowest ex- cavation in cutoff trench , 100 feet above riverbed ...
... earth fill Foundation : Pierre shale Slope protection : Riprap on gravel blanket on upstream face , seeded topsoil on downstream face Dimensions : Height : 144 feet above lowest ex- cavation in cutoff trench , 100 feet above riverbed ...
Page i
... Earth materials Page 1 11115 5 777 8 . ( b ) Riprap and rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 11 11 11 11 14 CHAPTER III -- DESIGN 9 . Hydraulic ...
... Earth materials Page 1 11115 5 777 8 . ( b ) Riprap and rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 11 11 11 11 14 CHAPTER III -- DESIGN 9 . Hydraulic ...
Page ii
... cutoff trench and other excavation work 47 . B. Embankment Operations Borrow area operation ( a ) South borrow area ( b ) North borrow and spillway areas 61 61 61 63 63 63 8883 CONTENTS ( Continued ) Section Page 48 . Earth fill ii.
... cutoff trench and other excavation work 47 . B. Embankment Operations Borrow area operation ( a ) South borrow area ( b ) North borrow and spillway areas 61 61 61 63 63 63 8883 CONTENTS ( Continued ) Section Page 48 . Earth fill ii.
Page iii
... Earth fill placement ( a ) Control 49 . Crushed rock and riprap placement 635 65 65 66 C. Concrete 50 . Materials ( a ) Sand 66 66 ( b ) Coarse aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 ...
... Earth fill placement ( a ) Control 49 . Crushed rock and riprap placement 635 65 65 66 C. Concrete 50 . Materials ( a ) Sand 66 66 ( b ) Coarse aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 ...
Page 1
... earth structure approximately 8 , 600 feet long and rises 144 feet above the lowest point of the excavation . A spillway with a maximum discharge capacity of 126 , 500 second- feet , constructed through the left abutment , protects the ...
... earth structure approximately 8 , 600 feet long and rises 144 feet above the lowest point of the excavation . A spillway with a maximum discharge capacity of 126 , 500 second- feet , constructed through the left abutment , protects the ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches