Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 10
Page
... cubic yards Slopes : Upstream , 6 to 1 to ele- vation 2710 , 3 to 1 to elevation 2760 , and 2-1 / 2 to 1 to eleva- tion 2793 Downstream , 10 to 1 to elevation 2710 , 4 to 1 to eleva- tion 2735 , 2-1 / 2 to 1 to eleva- tion 2760 , and 2 ...
... cubic yards Slopes : Upstream , 6 to 1 to ele- vation 2710 , 3 to 1 to elevation 2760 , and 2-1 / 2 to 1 to eleva- tion 2793 Downstream , 10 to 1 to elevation 2710 , 4 to 1 to eleva- tion 2735 , 2-1 / 2 to 1 to eleva- tion 2760 , and 2 ...
Page 10
... cubic yards of material in borrow area - shall be excavated prior to June 1 , 1951 , as shown in typical section , drawing 328-0-1002 , and general sections , drawings 328-0-100 and 1002 280 AMRIO AMON 1800- 150h 9710 . -8800 2005 ANSE ...
... cubic yards of material in borrow area - shall be excavated prior to June 1 , 1951 , as shown in typical section , drawing 328-0-1002 , and general sections , drawings 328-0-100 and 1002 280 AMRIO AMON 1800- 150h 9710 . -8800 2005 ANSE ...
Page 22
... cubic yards of zone 2 material . During later stages of exploratory work and early phases of construction , it became apparent that a much larger quantity ( about 1,100,000 cubic yards ) of zone 2 material would be available . In order ...
... cubic yards of zone 2 material . During later stages of exploratory work and early phases of construction , it became apparent that a much larger quantity ( about 1,100,000 cubic yards ) of zone 2 material would be available . In order ...
Page 63
... cubic - yard shovels and draglines , and motor scrapers . The excavated material was hauled to the embankment in bottom - dump trucks , having capacities ranging from 13 to 17 cubic yards . Fine sand and silt were the principal ...
... cubic - yard shovels and draglines , and motor scrapers . The excavated material was hauled to the embankment in bottom - dump trucks , having capacities ranging from 13 to 17 cubic yards . Fine sand and silt were the principal ...
Page 71
... cubic yards of concrete mixed for determining air content , unit weight , and compressive strengths . Six- by 12 ... cubic - yard crane , 2 - cubic - yard pneumatically operated concrete buckets , two 1 - cubic - yard manually op- erated ...
... cubic yards of concrete mixed for determining air content , unit weight , and compressive strengths . Six- by 12 ... cubic - yard crane , 2 - cubic - yard pneumatically operated concrete buckets , two 1 - cubic - yard manually op- erated ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost