Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 31
Page
... cost information . Chapter II is devoted to investigations of construction materials , and studies of railroad , highway , and county road relocations . Discussions on the de- sign of the dam , spillway and river outlets , canal outlet ...
... cost information . Chapter II is devoted to investigations of construction materials , and studies of railroad , highway , and county road relocations . Discussions on the de- sign of the dam , spillway and river outlets , canal outlet ...
Page i
... Cost CHAPTER II -- INVESTIGATIONS 6 . General 7 . Construction materials ( a ) Earth materials Page 1 11115 5 777 8 . ( b ) Riprap and rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) ...
... Cost CHAPTER II -- INVESTIGATIONS 6 . General 7 . Construction materials ( a ) Earth materials Page 1 11115 5 777 8 . ( b ) Riprap and rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) ...
Page iii
... Cost summary B. Pay item breakdown for contract I2r - 18601 , specifications No. 2689 90 C. D. E. F. G. H. Pay item breakdown for contract I2r - 19084 , specifications No. 3047 Cost of test installations Allowable stresses used in gate ...
... Cost summary B. Pay item breakdown for contract I2r - 18601 , specifications No. 2689 90 C. D. E. F. G. H. Pay item breakdown for contract I2r - 19084 , specifications No. 3047 Cost of test installations Allowable stresses used in gate ...
Page 1
... cost , and necessity for a protective dike at the head of the lake for the town of Trenton . Alternative sites west of Trenton were studied and a site 2 miles west of Trenton was finally selected as the best suited topographically and ...
... cost , and necessity for a protective dike at the head of the lake for the town of Trenton . Alternative sites west of Trenton were studied and a site 2 miles west of Trenton was finally selected as the best suited topographically and ...
Page 5
... costs Indirect Costs Preliminary surveys and investigations Designs , specifications , contract administration , etc. Engineering and inspection Administration and general expense Total indirect costs Total estimated cost 932,989 ...
... costs Indirect Costs Preliminary surveys and investigations Designs , specifications , contract administration , etc. Engineering and inspection Administration and general expense Total indirect costs Total estimated cost 932,989 ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost