Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 34
Page
... conduit : 5 feet 6 inches in diam- eter , 208 feet long Outlet pipe : 56 - inch - diameter pipe in horseshoe conduit , 244 feet long Gates : Two , 4 by 4 feet ( one is in- stalled in the emergency gate chamber and the other in the ...
... conduit : 5 feet 6 inches in diam- eter , 208 feet long Outlet pipe : 56 - inch - diameter pipe in horseshoe conduit , 244 feet long Gates : Two , 4 by 4 feet ( one is in- stalled in the emergency gate chamber and the other in the ...
Page ii
... conduit ( a ) Loadings Emergency gate chamber Horseshoe conduit ( a ) Loadings ( b ) Design considerations Outlet pipe Control house and stilling well ( a ) Design considerations High - pressure gates Miscellaneous equipment E. Railroad ...
... conduit ( a ) Loadings Emergency gate chamber Horseshoe conduit ( a ) Loadings ( b ) Design considerations Outlet pipe Control house and stilling well ( a ) Design considerations High - pressure gates Miscellaneous equipment E. Railroad ...
Page iv
... conduit of canal outlet works -- Compacting backfill around conduit 45 22 21 Canal outlet works -- Gate chambers and stilling well details 46 23 22 23 Control house and stilling well for canal outlet works 48 Canal outlet works -- Gate ...
... conduit of canal outlet works -- Compacting backfill around conduit 45 22 21 Canal outlet works -- Gate chambers and stilling well details 46 23 22 23 Control house and stilling well for canal outlet works 48 Canal outlet works -- Gate ...
Page v
... conduit being assembled 68 View from top of mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way ...
... conduit being assembled 68 View from top of mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way ...
Page 7
... conduit of the canal outlet works . The auxiliary cutoff trench provides a shale foundation for the conduit , and the impervious backfill provides a cutoff in the right abutment . This cutoff provides a percolation path about 740 feet ...
... conduit of the canal outlet works . The auxiliary cutoff trench provides a shale foundation for the conduit , and the impervious backfill provides a cutoff in the right abutment . This cutoff provides a percolation path about 740 feet ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost