Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 47
Page
... Concrete overflow chute type with stilling basin Crest length of overflow section : 126 feet Crest : Elevation 2743.00 Maximum discharge : 126 , 500 second- feet at water surface elevation 2785.6 ( as determined by model studies ) Gates ...
... Concrete overflow chute type with stilling basin Crest length of overflow section : 126 feet Crest : Elevation 2743.00 Maximum discharge : 126 , 500 second- feet at water surface elevation 2785.6 ( as determined by model studies ) Gates ...
Page iii
... Concrete 50 . Materials ( a ) Sand 66 66 ( b ) Coarse aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction ...
... Concrete 50 . Materials ( a ) Sand 66 66 ( b ) Coarse aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction ...
Page v
... concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a spillway pier with a crane and bucket 73 37 38 Laboratory technician preparing plastic tubing for installation of ...
... concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a spillway pier with a crane and bucket 73 37 38 Laboratory technician preparing plastic tubing for installation of ...
Page 7
... concrete , tons 96,000 ( 4 ) Riprap For dam , cu . yd . 206 , 500 For relocated railroad fill , cu . yd . 32,000 ( 5 ) Gravel or crushed rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth ...
... concrete , tons 96,000 ( 4 ) Riprap For dam , cu . yd . 206 , 500 For relocated railroad fill , cu . yd . 32,000 ( 5 ) Gravel or crushed rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth ...
Page 12
... Concrete Boot Lounching Romp RELOCATED HIGHWAY CHICAGO U.S. 34 BURLINGTON AND 315 COUNTY ROAD ( ADANDONED CABIN SITE COUNTY ROAD- C FLOWAGE EASEMENT AREA Width of R.R. Right of Way 312 -TRENTON DAM 2700 Public Use Recreational Area ...
... Concrete Boot Lounching Romp RELOCATED HIGHWAY CHICAGO U.S. 34 BURLINGTON AND 315 COUNTY ROAD ( ADANDONED CABIN SITE COUNTY ROAD- C FLOWAGE EASEMENT AREA Width of R.R. Right of Way 312 -TRENTON DAM 2700 Public Use Recreational Area ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost