Page iii
... Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting 69 71 71 74 74 74 D. Gate Installations 58 . High ...
... Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting 69 71 71 74 74 74 D. Gate Installations 58 . High ...
Page 42
... Cement grout or comparable Sta 22 + 50.00 on Main cut - off trench , excavated under previous contract equals Sta 4 + 00.00 on Accessory cut - off trench and Sta 4 + 00.00 on of outlet works- --Sta 2 + 840 El 2720.5 EL 2710 00 -100 ...
... Cement grout or comparable Sta 22 + 50.00 on Main cut - off trench , excavated under previous contract equals Sta 4 + 00.00 on Accessory cut - off trench and Sta 4 + 00.00 on of outlet works- --Sta 2 + 840 El 2720.5 EL 2710 00 -100 ...
Page 43
... cement- Cut - off collar ... CONDUIT Accessory cut - off trench and 561,0 .. steel pipe Preformed joint filler- Bottom of excavation -21 " Min . 24 " Av . -5'0 ' Av . , 4 ′ - 9 ′′ Min . of accessory cutoff trench Limits of special ...
... cement- Cut - off collar ... CONDUIT Accessory cut - off trench and 561,0 .. steel pipe Preformed joint filler- Bottom of excavation -21 " Min . 24 " Av . -5'0 ' Av . , 4 ′ - 9 ′′ Min . of accessory cutoff trench Limits of special ...
Page 46
... cement 4 " Gutter El 2679.00- 2 . E12673.75 8 " Gate by - pass- EL 2680.10 4 " Floor drain- -56 " LD Pipe E12679.67 Shale surface --- Inv . El 2671.00 Sta.4 + 65.63 Expansion joint cement-- 50E1 2671 42 -7-5 24 Av 21 Min . -Sta 4 + 6800 ...
... cement 4 " Gutter El 2679.00- 2 . E12673.75 8 " Gate by - pass- EL 2680.10 4 " Floor drain- -56 " LD Pipe E12679.67 Shale surface --- Inv . El 2671.00 Sta.4 + 65.63 Expansion joint cement-- 50E1 2671 42 -7-5 24 Av 21 Min . -Sta 4 + 6800 ...
Page 57
... cement for 3148 structures , relo- Ideal Cement Co. , Denver , Colo . 58,000 cation of Chicago , Burlington and Quincy Railroad around Trenton Dam - 39. Housing . A housing project for Bureau personnel was located close to the east edge ...
... cement for 3148 structures , relo- Ideal Cement Co. , Denver , Colo . 58,000 cation of Chicago , Burlington and Quincy Railroad around Trenton Dam - 39. Housing . A housing project for Bureau personnel was located close to the east edge ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost