Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 18
Page
... capacity : 1,000 second - feet with reservoir water surface eleva- tion at 2720.0 Canal Outlet Works Intake structure : Vertical shaft : 50 feet high Sill elevation : 2710.00 Outlet conduit : 5 feet 6 inches in diam- eter , 208 feet ...
... capacity : 1,000 second - feet with reservoir water surface eleva- tion at 2720.0 Canal Outlet Works Intake structure : Vertical shaft : 50 feet high Sill elevation : 2710.00 Outlet conduit : 5 feet 6 inches in diam- eter , 208 feet ...
Page 1
... capacity of 126 , 500 second- feet , constructed through the left abutment , protects the structure from possible flood damage . A river outlet is provided through the spillway structure for river regulation . At the opposite end of the ...
... capacity of 126 , 500 second- feet , constructed through the left abutment , protects the structure from possible flood damage . A river outlet is provided through the spillway structure for river regulation . At the opposite end of the ...
Page 13
... CAPACITY TABLE AREA CAPACITY ACRES ACRE - FEET 2493 9 O 2694 1.9 1 2696 20 31 2696 06 115 2700 121 292 T.3 N. 2702 170 592 ' 2704 302 1,072 T. 2 N. 2706 412 1,706 2708 502 2,780 27100 759 4,101 2715 1,126 0,705 2720 1,672 15,510 2726 ...
... CAPACITY TABLE AREA CAPACITY ACRES ACRE - FEET 2493 9 O 2694 1.9 1 2696 20 31 2696 06 115 2700 121 292 T.3 N. 2702 170 592 ' 2704 302 1,072 T. 2 N. 2706 412 1,706 2708 502 2,780 27100 759 4,101 2715 1,126 0,705 2720 1,672 15,510 2726 ...
Page 15
... capacity at maximum water surface elevation 2785.0 116,100 ( initially ) 4,100 254,000 107,670 361,670 The limiting water surface elevation of 2797.0 that would cause no property damage was determined for the town of Stratton , located ...
... capacity at maximum water surface elevation 2785.0 116,100 ( initially ) 4,100 254,000 107,670 361,670 The limiting water surface elevation of 2797.0 that would cause no property damage was determined for the town of Stratton , located ...
Page 16
... capacity until the flood control space is filled . " The safe channel capacity has been set at 10,000 c.f.s. See Data for Specification Designs , Sept. 17 , 1948 , par 1. 2. 15L . -DISCHARGE - ELEVATION ( Based on Hydraulics Laboratory ...
... capacity until the flood control space is filled . " The safe channel capacity has been set at 10,000 c.f.s. See Data for Specification Designs , Sept. 17 , 1948 , par 1. 2. 15L . -DISCHARGE - ELEVATION ( Based on Hydraulics Laboratory ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost