Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 10
Page iii
... aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting 69 71 71 74 74 74 D. Gate ...
... aggregate ( c ) Cement 66 67 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . 67 69 Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting 69 71 71 74 74 74 D. Gate ...
Page v
... aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a spillway pier with a crane ...
... aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a spillway pier with a crane ...
Page 7
... aggregate for concrete , tons 96,000 ( 4 ) Riprap For dam , cu . yd . 206 , 500 For relocated railroad fill , cu . yd . 32,000 ( 5 ) Gravel or crushed rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd ...
... aggregate for concrete , tons 96,000 ( 4 ) Riprap For dam , cu . yd . 206 , 500 For relocated railroad fill , cu . yd . 32,000 ( 5 ) Gravel or crushed rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd ...
Page 66
... Aggregate .-- Three sizes of coarse aggregate used in the concrete were purchased by the contractor from Brannon Sand and Gravel Co. , Denver , Colo . , Cass Co. , Golden , Colo . , and Guernsey Rock Co. , Guernsey , Wyo . These aggregates ...
... Aggregate .-- Three sizes of coarse aggregate used in the concrete were purchased by the contractor from Brannon Sand and Gravel Co. , Denver , Colo . , Cass Co. , Golden , Colo . , and Guernsey Rock Co. , Guernsey , Wyo . These aggregates ...
Page 67
... aggregate consisted of chert which reacted deleteriously with high - alkali cement . The aggregate contained an excess of deeply weathered and otherwise unsound particles , but because of the good service of this aggregate in numerous ...
... aggregate consisted of chert which reacted deleteriously with high - alkali cement . The aggregate contained an excess of deeply weathered and otherwise unsound particles , but because of the good service of this aggregate in numerous ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost