Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 14
Page
... Nebraska ing 2. Engin . Library тс 558 General Information .07 то 4158 Dam Purpose : Flood control , diversion for ... Nebr . Constructed : 1949-1953 Water supply : Republican River Drainage area : 4,003 square miles Maximum flood ...
... Nebraska ing 2. Engin . Library тс 558 General Information .07 то 4158 Dam Purpose : Flood control , diversion for ... Nebr . Constructed : 1949-1953 Water supply : Republican River Drainage area : 4,003 square miles Maximum flood ...
Page 1
... Nebr . The dam is a rolled- earth structure approximately 8 , 600 feet long and rises 144 feet above the lowest ... Nebr . , and Med- icine Creek Dam 8 miles northwest of Cambridge , Nebr . This development plan was outlined in Senate ...
... Nebr . The dam is a rolled- earth structure approximately 8 , 600 feet long and rises 144 feet above the lowest ... Nebr . , and Med- icine Creek Dam 8 miles northwest of Cambridge , Nebr . This development plan was outlined in Senate ...
Page 10
... NEBR . TRENTON DAM CHECHED SUBMITTED . RECOMMENDED . APPROVED . DRAWN SCALE OF FEET TRAGED . Figure 5 .-- Plan of borrow areas and logs of several test holes . Right of way boundary Hay Canyon R. 35 W. R. 34 W. 2900 10,100. 10.
... NEBR . TRENTON DAM CHECHED SUBMITTED . RECOMMENDED . APPROVED . DRAWN SCALE OF FEET TRAGED . Figure 5 .-- Plan of borrow areas and logs of several test holes . Right of way boundary Hay Canyon R. 35 W. R. 34 W. 2900 10,100. 10.
Page 11
... Nebr . , for quartzitic sandstone ; Golden , Colo . , for basalt or granite ; and Guernsey , Wyo . , for dolomite . A study of the freight rates , quality , quantity , and production costs indicated that the hard , sound , and durable ...
... Nebr . , for quartzitic sandstone ; Golden , Colo . , for basalt or granite ; and Guernsey , Wyo . , for dolomite . A study of the freight rates , quality , quantity , and production costs indicated that the hard , sound , and durable ...
Page 14
... Nebr . , was favored by the Bureau of Reclamation . Subsequently , the Bureau of Public Roads in conjunction with the State of Nebraska , recommended a route north of the relocated railroad and additional studies were made of the " all ...
... Nebr . , was favored by the Bureau of Reclamation . Subsequently , the Bureau of Public Roads in conjunction with the State of Nebraska , recommended a route north of the relocated railroad and additional studies were made of the " all ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost