Page images
PDF
[merged small][table]
[merged small][table]
[merged small][table]
[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

95

96 97 98

(a) (b)

(a)

(b)

(a) (b)

(a)

Furnishing and installing electrical metal conduit 2 inches in diameter

Furnishing and installing ground wire

Installing electrical conductors

Installing electrical apparatus

Extra Work Order No. 1

Straightening Reinforce-
ment Bars

Cleaning Reinforcement
Bars

Extra Work Order No. 2

Stockpiling, reloading, and performing additional hauling of crushed rock blanket material

Stockpiling, reloading, and performing additional hauling of riprap rock

Order for Changes No. 1

Excavation for extension of cutoff trench and transportation to the dam embankment or disposal area

Unwatering extension of cutoff trench, providing drains for disposal of this water, and back-filling these drains

Order for Changes No. 2

Deferred remainder of seeding of downstream slopes until the spring of 1954

Order for Changes No. 3

Constructing approximately 92 linear feet of formed drains and metal cover

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]
[merged small][table]
« PreviousContinue »