The holes were backfilled after installation. All tips were connected with plastic tubes to gages in a terminal well at station 54+00, 183.5 feet downstream from the axis of the dam. A terminal well is shown in figure 38. Pressures in the embankment are transmitted from the tip through the water-filled plastic tubes, and observed on the gage.

62. Settlement Installations. An embankment settlement system was installed in a test pit at station 53+00, 99 feet upstream from the dam axis. The lowest crossarm of the system was placed on shale bedrock at about elevation 2649. Backfill was completed around the riser pipe from this crossarm at about elevation 2707, and nine additional crossarm units were placed at 5-foot intervals to the surface of the completed embankment.

Two standard-type foundation base plates (fig. 39) were installed at stations 15+00 and 21+00, 20 feet upstream from the axis, on the unconsolidated loessial foundation in the abutment of the dam. Also, four temporary plates, each consisting of a steel plate and riser pipe extending to the surface of the embankment, were installed at the following locations and elevations:

[blocks in formation]

After the embankment had been completed above a plate, the plate was located by drilling and an access pipe was installed to the surface of the dam.

A total of 173 surface settlement points were installed at 200-foot intervals on the surface of the embankment and parallel to the dam axis (fig. 40). These points consist of 3/4- to 1-inch reinforcement bars ranging in length from 5 to 8 feet. These bars were driven flush with the ground surface and a concrete collar, approximately 15 inches thick and 15 inches in diameter, was placed around each bar within 3 inches from the top. As concrete was placed, the bars were alined and the upper end of each bar was center punched.

Shallow holes were drilled near the edges of the spillway floor slab and wall footing for use in determining elevations. The elevation of each hole was obtained by means of a level and leveling rod.

In the canal outlet works, a series of 3/8-inch-diameter brass bolts with round heads were placed at 25-foot stations in the invert for use in determining settlement. Vertical control was obtained with the aid of two permanent monuments located on the line center of the canal outlet works.

APPENDIX A

Cost summary:

(A cost breakdown for Trenton Dam and Reservoir and the railroad and highway relocations, as of August 28, 1957.)

Major Construction Contracts

Specifications

number

2689

3047

3112

3113

4260

VII-111

701C-200

Item, contractor, and contract number
Foundation construction--Marshall, Haas and Royce, con-
tract 12r-18601

Construction of dam--United Concrete Pipe Corp., Vin-
nell Co., Inc., and Ralph A. Bell, contract I2r-19084
Earthwork and structures except bridge structures, re-
location of C. B. & Q. Railroad--Perry McGlone Const.
Co., contract I2r-19157

Superstructures for bridges, relocation of C. B. & Q.
Railroad--American Bridge Co., contract I2r-19183
Spillway chute modification--Cass Co., contract 14-06-
D-1042

Constructing residence, combination garage and testing
laboratory, water and gas supply, and sewage disposal
systems for Government field construction facilities and
caretaker's residence--Northwest Realty Co., contract
181r-1250

Relocation of county road at Swanson Lake--Nichols Const.
Co., contract I103r-1582

Total cost to the Government

$ 1,672,398

5,570,632

2,786,959

546, 345

2,329

25,767

131, 232

[blocks in formation]

Stream gaging station, spillway channel--Rentlor Co., Inc.,
contract 14-06-701-1345

6,820

Subtotal, Major Construction Contracts

$10,812, 229

[blocks in formation]

701C-330(SF)

701C-357 (SF)

Construction of terraces, Swanson Lake--A. H. Williams

Construction of terraces, Swanson Lake--James W.
McCormick

Subtotal, Minor Construction Contracts

135

276

338

$ 4,299

[blocks in formation]

3002

3080

3121

3129

3148

Outlet pipe for dam--Keys Tank Co., contract I2r-19114
Portland-pozzolan cement--Ash Grove, contract 12r-

19083

High pressure gates for spillway river outlets--Hardie-
Tines Mfg. Co., contract I2r-19238

Structural steel for underpass on relocated C. B. & Q.
Railroad--American Bridge Co., contract I2r-19188
Portland cement--Ideal Cement Co., contract 12r-
19182

Total cost

to the Government

$ 20,380

5,707

5,916

53, 125

3,302

49,389

[blocks in formation]

3321

Radial gates for spillway--Johnson Machine Works, con-
tract I2r-19419

138,259

3420

Radial gate hoists for spillway--Northwest Marine Iron
Works, contract I2r-19518

119,523

3573

Trashracks for canal outlet works, intake structure,
and river outlet works--St. Joseph Structural Steel Co.,
contract 12r-19679

5,445

Subtotal, Major Supply Contracts

$ 898,996

[blocks in formation]

701-67,217-A Pipe and expansion anchors--contract I103r-1187 701-67,216-A Oil pump units--contracts I103r-1188 and I103r-1189

701-67,218-A Oil pump units--contracts I103r-1194 and I103r

1, 128

1,314

505

833

701-67,222-A

1195

Pipe--contract I103r-1222

420

3,310

701-67,224-A Level gage piping--contracts I103r-1231 and I103r1232

[blocks in formation]

696

975

731

18,570

[blocks in formation]

701-67,229-D Air piping, ice preventative system--contract I103r-1405

1,387

701-9391-B

Asphalt--contract I103r-1460

450

701-67,247-A Spillway metalwork--contract I103r-1441

[blocks in formation]