Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 42
Page
... supply : Frenchman Creek . Maximum flood : 9,000 second - feet ( 1940 ) . Reservoir Area : 2,557 acres . Controlled storage : 80,730 acre - feet . Irrigation storage : 36,013 acre - feet . Dead storage : 8,467 acre - feet . Flood ...
... supply : Frenchman Creek . Maximum flood : 9,000 second - feet ( 1940 ) . Reservoir Area : 2,557 acres . Controlled storage : 80,730 acre - feet . Irrigation storage : 36,013 acre - feet . Dead storage : 8,467 acre - feet . Flood ...
Page viii
... Supply pond for rotary drilling rig at drainage well No. 3 . 61. Permanent 24 - inch casing being installed in drainage well No. 3 62. Placing filter material in drainage well No. 3 · 128 128 • 132 132 63. Construction operations for ...
... Supply pond for rotary drilling rig at drainage well No. 3 . 61. Permanent 24 - inch casing being installed in drainage well No. 3 62. Placing filter material in drainage well No. 3 · 128 128 • 132 132 63. Construction operations for ...
Page 4
... supply from stream diversion , improper financing of construction charges , and inadequate structures . The principal use of cultivated areas on the river bottom and terrace lands is for the production of corn and alfalfa ; whereas ...
... supply from stream diversion , improper financing of construction charges , and inadequate structures . The principal use of cultivated areas on the river bottom and terrace lands is for the production of corn and alfalfa ; whereas ...
Page 5
... supply the load formerly served by the Oliver Brothers ' plant . The REA now supplies power to consumers who had received power previously from the Grosbach - Williams and Krotter Powerplants . 7. Industrial Development . Industrial ...
... supply the load formerly served by the Oliver Brothers ' plant . The REA now supplies power to consumers who had received power previously from the Grosbach - Williams and Krotter Powerplants . 7. Industrial Development . Industrial ...
Page 6
... supply from underground sources 23,500 acres of irri- gable land scattered throughout the Republican Valley ; of this amount , approximately 11,300 acres are located within the division boundaries . Thus , the portion of the Wells unit ...
... supply from underground sources 23,500 acres of irri- gable land scattered throughout the Republican Valley ; of this amount , approximately 11,300 acres are located within the division boundaries . Thus , the portion of the Wells unit ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...