Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 83
Page
... Basin Project Purpose : Irrigation water , flood control , sediment retention , recreational facilities , fish and ... stilling basin . Crest elevations : Spillway , 3097.0 ; outlet works , 3080.0 . Maximum discharge : Spillway , 200,000 ...
... Basin Project Purpose : Irrigation water , flood control , sediment retention , recreational facilities , fish and ... stilling basin . Crest elevations : Spillway , 3097.0 ; outlet works , 3080.0 . Maximum discharge : Spillway , 200,000 ...
Page ii
... Stilling basin 42 . General . 43. Gated crest 44. Uncontrolled crest . 45. Chute . . . 46. Stilling basin • 47. Model studies Page 33 34 35 35 38 38 40 090 40 40 46 46 46 48 49 1. Hydraulic Design 49 49 49 49 50 51 2. Structural Design ...
... Stilling basin 42 . General . 43. Gated crest 44. Uncontrolled crest . 45. Chute . . . 46. Stilling basin • 47. Model studies Page 33 34 35 35 38 38 40 090 40 40 46 46 46 48 49 1. Hydraulic Design 49 49 49 49 50 51 2. Structural Design ...
Page iii
... Stilling basin 69 ( h ) Outlet channel . 71 1. Hydraulic Design 63 . General . 64 . Stilling basin 71 71 65 . Model studies 71 2. Structural Design 66 . Design stresses , loadings , etc. 74 67 . Trashrack structure 74 68 . Pressure ...
... Stilling basin 69 ( h ) Outlet channel . 71 1. Hydraulic Design 63 . General . 64 . Stilling basin 71 71 65 . Model studies 71 2. Structural Design 66 . Design stresses , loadings , etc. 74 67 . Trashrack structure 74 68 . Pressure ...
Page vii
... stilling basin wall 33. Ladder , guardrail , and walk used in pier construction work 34. Spillway stilling basin -- Foundation conditions and unwatering units . 35. Outlet works trench -- Campacting backfill by use of a crawl tractor ...
... stilling basin wall 33. Ladder , guardrail , and walk used in pier construction work 34. Spillway stilling basin -- Foundation conditions and unwatering units . 35. Outlet works trench -- Campacting backfill by use of a crawl tractor ...
Page viii
... stilling basin • • 118 123 • 123 124 125 · 126 59. A section of relocated Nebraska State Highway No. 61 60. Supply pond for rotary drilling rig at drainage well No. 3 . 61. Permanent 24 - inch casing being installed in drainage well No ...
... stilling basin • • 118 123 • 123 124 125 · 126 59. A section of relocated Nebraska State Highway No. 61 60. Supply pond for rotary drilling rig at drainage well No. 3 . 61. Permanent 24 - inch casing being installed in drainage well No ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...