Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 48
Page ii
... slab 51 52 51. Gate structure . 52 ( a ) Loadings , foundation pressures , and sliding factors . 53 52. Highway bridge 54 · 53. Chute floor 55 54. Chute walls 55 55. Stilling basin ( a ) Walls ( b ) Wing wall extensions . 56. Drainage ...
... slab 51 52 51. Gate structure . 52 ( a ) Loadings , foundation pressures , and sliding factors . 53 52. Highway bridge 54 · 53. Chute floor 55 54. Chute walls 55 55. Stilling basin ( a ) Walls ( b ) Wing wall extensions . 56. Drainage ...
Page 44
... 76.82 super- elevated to meet highway requirements by increasing slab thickness . Maximum increase , at station 38 + 76.82 , is 0.26 . 2. Reinforcement not shown Sta 8 + 78.50 Sta . 9 + 3400 Warped. 44 B Embankment 33333.
... 76.82 super- elevated to meet highway requirements by increasing slab thickness . Maximum increase , at station 38 + 76.82 , is 0.26 . 2. Reinforcement not shown Sta 8 + 78.50 Sta . 9 + 3400 Warped. 44 B Embankment 33333.
Page 46
... slab . This slab is 15 inches thick and extends 95.5 feet upstream from the upstream edge of the gate structure . On the upstream edge of this slab , a 6 - foot- deep cutoff is provided . Right and left inlet training walls are provided ...
... slab . This slab is 15 inches thick and extends 95.5 feet upstream from the upstream edge of the gate structure . On the upstream edge of this slab , a 6 - foot- deep cutoff is provided . Right and left inlet training walls are provided ...
Page 48
... slab bridge , 369 feet long and 26 feet wide . The bridge spans are supported in the same manner and placed at the same level as the hoist and operating bridge . A compressor and battery room struc- ture is located above the ...
... slab bridge , 369 feet long and 26 feet wide . The bridge spans are supported in the same manner and placed at the same level as the hoist and operating bridge . A compressor and battery room struc- ture is located above the ...
Page 49
... slab and foundation which prevents the accumulation of uplift pressures under the slab . ( d ) Stilling Basin .-- The stilling basin is a rectangular concrete channel , 115 feet long and 400 feet wide , and is provided with ...
... slab and foundation which prevents the accumulation of uplift pressures under the slab . ( d ) Stilling Basin .-- The stilling basin is a rectangular concrete channel , 115 feet long and 400 feet wide , and is provided with ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...