Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 55
Page
... Riprap on gravel blanket on upstream face , rockfill on downstream face . Dimensions : Height : 103 feet above streambed , 146 feet above excavation . Crest length : 2,603 feet . Crest elevation : 3137.5 . Volume : 1,600,000 cubic yards ...
... Riprap on gravel blanket on upstream face , rockfill on downstream face . Dimensions : Height : 103 feet above streambed , 146 feet above excavation . Crest length : 2,603 feet . Crest elevation : 3137.5 . Volume : 1,600,000 cubic yards ...
Page i
... Riprap . . C. Postconstruction Seepage Developments Observation points . 23 . 24. Measuring points · • · 25 . 26 . 27 . 28 . 29 . 30 . 31 . CHAPTER III -- DESIGN OF DAM AND DIKE A. Foundation Treatment Consolidation of dike foundation ...
... Riprap . . C. Postconstruction Seepage Developments Observation points . 23 . 24. Measuring points · • · 25 . 26 . 27 . 28 . 29 . 30 . 31 . CHAPTER III -- DESIGN OF DAM AND DIKE A. Foundation Treatment Consolidation of dike foundation ...
Page iv
... Riprap 107 B. Concrete Work 101 . Aggregates . 109 102 . Cement 112 103 . Reinforcement bars . 113 104 . Batching facilities 113 105 . Forms 115 106 . Mixing and placing 117 107 . Concrete control 120 · 108 . Concrete curing 121 109 ...
... Riprap 107 B. Concrete Work 101 . Aggregates . 109 102 . Cement 112 103 . Reinforcement bars . 113 104 . Batching facilities 113 105 . Forms 115 106 . Mixing and placing 117 107 . Concrete control 120 · 108 . Concrete curing 121 109 ...
Page vii
... riprap . 43. Dozer placing riprap on upstream face of dam 44. Completed riprap on upstream face of dam 45. Batch plant and aggregate bunkers 46. General batch plant layout with finish screening facilities 89 89 90 90 95 98 98 100 · 100 ...
... riprap . 43. Dozer placing riprap on upstream face of dam 44. Completed riprap on upstream face of dam 45. Batch plant and aggregate bunkers 46. General batch plant layout with finish screening facilities 89 89 90 90 95 98 98 100 · 100 ...
Page 13
... riprap . In 1946 , quarries near Franklin , Nebr . , were selected as possible riprap sources after investigation of 13 other possible sources . It was recognized when the specifications were written that locating and ob- taining ...
... riprap . In 1946 , quarries near Franklin , Nebr . , were selected as possible riprap sources after investigation of 13 other possible sources . It was recognized when the specifications were written that locating and ob- taining ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...