Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 52
Page ii
... . Sheet steel piling cutoffs . 59 3. Mechanical and Electrical Equipment 60 . 58. Radial gates and hoists . 59. Ice prevention system Electrical installation 60 63 64 ii CONTENTS ( Continued ) Page C. Outlet Works 61 . -
... . Sheet steel piling cutoffs . 59 3. Mechanical and Electrical Equipment 60 . 58. Radial gates and hoists . 59. Ice prevention system Electrical installation 60 63 64 ii CONTENTS ( Continued ) Page C. Outlet Works 61 . -
Page vi
... hoist deck • 24. Outlet works -- Alinement , profile , and conduit sections 25. Outlet conduit trashrack structure 26. Outlet works conduit and gate chamber • Page 2 3 7 11 15 18 23 26 22 83 27 28 23 336 39 41 42 43 44 47 48 55 8889 61 ...
... hoist deck • 24. Outlet works -- Alinement , profile , and conduit sections 25. Outlet conduit trashrack structure 26. Outlet works conduit and gate chamber • Page 2 3 7 11 15 18 23 26 22 83 27 28 23 336 39 41 42 43 44 47 48 55 8889 61 ...
Page 37
... Hoist speed it ft./min.- Design Flood Hydrograph from Hydrograph dated 8-2-45- TIME IN HOURS Center Gates 12 at 21 " Middle Gates 11 at 21 " Outside Gates 10 at 21 t to Fig . I The diversion through the outlet works could be ...
... Hoist speed it ft./min.- Design Flood Hydrograph from Hydrograph dated 8-2-45- TIME IN HOURS Center Gates 12 at 21 " Middle Gates 11 at 21 " Outside Gates 10 at 21 t to Fig . I The diversion through the outlet works could be ...
Page 46
... hoist and operating deck which carries the gate control mechanism is situated along the upstream side of the gate structure . It is a concrete beam and deck slab bridge 369 Axis of dom NASI'N NL 97,560.00 E. 100 , 259.16 46 Description ...
... hoist and operating deck which carries the gate control mechanism is situated along the upstream side of the gate structure . It is a concrete beam and deck slab bridge 369 Axis of dom NASI'N NL 97,560.00 E. 100 , 259.16 46 Description ...
Page 47
... hoists not 3-0 Dia float- well intake pipe El . 3138.00 -50-0 " . Access well -50-0 ° Access wells- Horst motor Float wells- Compressor room access ladder well with metal hotch cover Hoist shaft Supply pipe- Supply pipe Gear boxes oist ...
... hoists not 3-0 Dia float- well intake pipe El . 3138.00 -50-0 " . Access well -50-0 ° Access wells- Horst motor Float wells- Compressor room access ladder well with metal hotch cover Hoist shaft Supply pipe- Supply pipe Gear boxes oist ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...