Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 100
Page
... gates : Six gates 50 by 30 feet in size . Stilling basins : Spillway , reinforced concrete with chute blocks and dentated end sills . Outlet works , reinforced concrete with deflector wall . Concrete : 45,627 cubic yards . Reinforcing ...
... gates : Six gates 50 by 30 feet in size . Stilling basins : Spillway , reinforced concrete with chute blocks and dentated end sills . Outlet works , reinforced concrete with deflector wall . Concrete : 45,627 cubic yards . Reinforcing ...
Page ii
... gate structure ( c ) Chute . ( d ) Stilling basin 42 . General . 43. Gated crest 44. Uncontrolled crest . 45. Chute . . . 46. Stilling basin • 47. Model studies Page 33 34 35 35 38 38 40 090 40 40 46 46 46 48 49 1. Hydraulic Design 49 ...
... gate structure ( c ) Chute . ( d ) Stilling basin 42 . General . 43. Gated crest 44. Uncontrolled crest . 45. Chute . . . 46. Stilling basin • 47. Model studies Page 33 34 35 35 38 38 40 090 40 40 46 46 46 48 49 1. Hydraulic Design 49 ...
Page iii
... Gate chamber . 74 70 . Horseshoe conduit 74 71 . Valve house 74 72 . Stilling basin ( a ) Chute . ( b ) Pool ૐ ન 75 75 76 ( c ) Wing walls 76 3. Mechanical and Electrical Equipment 73 . High - pressure gate 76 74 . Steel outlet pipe ...
... Gate chamber . 74 70 . Horseshoe conduit 74 71 . Valve house 74 72 . Stilling basin ( a ) Chute . ( b ) Pool ૐ ન 75 75 76 ( c ) Wing walls 76 3. Mechanical and Electrical Equipment 73 . High - pressure gate 76 74 . Steel outlet pipe ...
Page vi
... gate structure -- Plan and sections 20. 8 - inch underflow drain embedded in gravel under the spillway floor 21. Framing of completed spillway highway bridge 22. 50- by 30 - foot radial gate -- General installation 23. Spillway gates ...
... gate structure -- Plan and sections 20. 8 - inch underflow drain embedded in gravel under the spillway floor 21. Framing of completed spillway highway bridge 22. 50- by 30 - foot radial gate -- General installation 23. Spillway gates ...
Page 1
... gate structure and a concrete stilling basin . The spillway has a lip elevation of 3097 , and discharge is either manually or automatically controlled by six 50- by 30- foot radial gates . The outlet works extends through the dam and ...
... gate structure and a concrete stilling basin . The spillway has a lip elevation of 3097 , and discharge is either manually or automatically controlled by six 50- by 30- foot radial gates . The outlet works extends through the dam and ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...