Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 59
Page i
... . Cutoffs . . . Drainage features • • • · Design considerations Zoning requirements . Description of zones • · • • 13 14 19 19 21 21 21 2223 25 25 25 30 B. Embankment 33333 31 31 32 . Dimensions . 33. Design details . · CONTENTS i.
... . Cutoffs . . . Drainage features • • • · Design considerations Zoning requirements . Description of zones • · • • 13 14 19 19 21 21 21 2223 25 25 25 30 B. Embankment 33333 31 31 32 . Dimensions . 33. Design details . · CONTENTS i.
Page ii
... Drainage system and filter blanket . 55 57 58 58 57. Sheet steel piling cutoffs . 59 3. Mechanical and Electrical Equipment 60 . 58. Radial gates and hoists . 59. Ice prevention system Electrical installation 60 63 64 ii CONTENTS ...
... Drainage system and filter blanket . 55 57 58 58 57. Sheet steel piling cutoffs . 59 3. Mechanical and Electrical Equipment 60 . 58. Radial gates and hoists . 59. Ice prevention system Electrical installation 60 63 64 ii CONTENTS ...
Page iv
... Drainage wells and test shafts 127 127 127 129 • · • 115 . Auxiliary drainage 130 • CONTENTS ( Continued ) CHAPTER VII -- TEST INSTALLATIONS · iv.
... Drainage wells and test shafts 127 127 127 129 • · • 115 . Auxiliary drainage 130 • CONTENTS ( Continued ) CHAPTER VII -- TEST INSTALLATIONS · iv.
Page vi
... drainage installation . . 9. Sand zones , abutment cutoffs , and channel blanket . 10. Drainage well and test shafts . . 11. Enders Dam -- General plan and sections 12. Dike plan and sections 13. Routing of design flood through spillway ...
... drainage installation . . 9. Sand zones , abutment cutoffs , and channel blanket . 10. Drainage well and test shafts . . 11. Enders Dam -- General plan and sections 12. Dike plan and sections 13. Routing of design flood through spillway ...
Page viii
... drainage well No. 3 62. Placing filter material in drainage well No. 3 · 128 128 • 132 132 63. Construction operations for placing abutment tile drain . 133 64. Dike foundation settlement plate · 65. Method of locating dike foundation ...
... drainage well No. 3 62. Placing filter material in drainage well No. 3 · 128 128 • 132 132 63. Construction operations for placing abutment tile drain . 133 64. Dike foundation settlement plate · 65. Method of locating dike foundation ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...