Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 29
Page iv
... curing 121 109 . Cold weather protection 122 C. Miscellaneous Work 110 . Driving steel sheet piling 122 111 . 112 . 113 . 114 . Relocation of State Highway No. 61 Miscellaneous force account work Contract for completion of Enders Dam ...
... curing 121 109 . Cold weather protection 122 C. Miscellaneous Work 110 . Driving steel sheet piling 122 111 . 112 . 113 . 114 . Relocation of State Highway No. 61 Miscellaneous force account work Contract for completion of Enders Dam ...
Page viii
... curing compound applied on spillway floor . 55. Placing sand on spillway floor for water curing 56. View showing numbering on piles . • 57. View showing varying depths of pile penetration 58. Steel sheet piling in spillway stilling ...
... curing compound applied on spillway floor . 55. Placing sand on spillway floor for water curing 56. View showing numbering on piles . • 57. View showing varying depths of pile penetration 58. Steel sheet piling in spillway stilling ...
Page 86
... curing of concrete , and batch plant operations . Prepares inspection reports as required or di- rected . Inspects placing of miscella- neous emergency gates , outlet pipes , valves , metal railings , and other metal- work . 7 employees ...
... curing of concrete , and batch plant operations . Prepares inspection reports as required or di- rected . Inspects placing of miscella- neous emergency gates , outlet pipes , valves , metal railings , and other metal- work . 7 employees ...
Page 119
... disadvantage. Figure 52 .-- Concrete placing operations on spillway channel floor . Figure 53 .-- Pumpcrete pipeline discharging into metal chute . ED - 9-120 , May 5 , 1949 . Figure 54 .-- White - pigmented curing compound applied on. 119.
... disadvantage. Figure 52 .-- Concrete placing operations on spillway channel floor . Figure 53 .-- Pumpcrete pipeline discharging into metal chute . ED - 9-120 , May 5 , 1949 . Figure 54 .-- White - pigmented curing compound applied on. 119.
Page 121
... curing facilities , laboratory - cured cylinders were placed in water baths after the removal from the molds and remained there until the end of the curing period . In order to correlate the water - cured concrete with concrete sub ...
... curing facilities , laboratory - cured cylinders were placed in water baths after the removal from the molds and remained there until the end of the curing period . In order to correlate the water - cured concrete with concrete sub ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...