Enders Dam, Constructed 1947-1951, Frenchman-Cambridge Unit, Missouri River Basin Project: Technical Record of Design and Construction |
From inside the book
Results 1-5 of 51
Page 1
... consists of a closed channel with a concrete trashrack structure , a concrete and steel conduit , a concrete gate structure , a concrete valve house , and a concrete stilling basin . Enders reservoir is approximately 1 mile wide and ...
... consists of a closed channel with a concrete trashrack structure , a concrete and steel conduit , a concrete gate structure , a concrete valve house , and a concrete stilling basin . Enders reservoir is approximately 1 mile wide and ...
Page 8
... consist of 710 acres irrigated by stream pumps on Frenchman Creek and 180 acres served by the McLain canal on Stinking Water Creek . Severe shortages experienced by these lands due to senior water rights of lands in the Frenchman unit ...
... consist of 710 acres irrigated by stream pumps on Frenchman Creek and 180 acres served by the McLain canal on Stinking Water Creek . Severe shortages experienced by these lands due to senior water rights of lands in the Frenchman unit ...
Page 9
... consists of alluvial materials on the valley floor and of re- worked loess and slope wash materials on the valley sides . The alluvial materials are a mixture of fine sand and small pea gravel with a high percentage of chalk particles ...
... consists of alluvial materials on the valley floor and of re- worked loess and slope wash materials on the valley sides . The alluvial materials are a mixture of fine sand and small pea gravel with a high percentage of chalk particles ...
Page 12
... consist of continuous layers of sand and partially to completely cemented sandstone beds . Sands are brown to grey , calcareous , clean to dirty , well to poorly graded , and crossbedded . The particle sizes vary from fine sand to fine ...
... consist of continuous layers of sand and partially to completely cemented sandstone beds . Sands are brown to grey , calcareous , clean to dirty , well to poorly graded , and crossbedded . The particle sizes vary from fine sand to fine ...
Page 25
... consists of large boulders from required excavation placed adjacent to the left abutment in the area where sand boils developed . A channel blanket was added to the foundation treatment in the area upstream from and adjacent to the ...
... consists of large boulders from required excavation placed adjacent to the left abutment in the area where sand boils developed . A channel blanket was added to the foundation treatment in the area upstream from and adjacent to the ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...