... blanket on upstream face , rockfill on downstream face . Dimensions : Height : 103 feet above streambed , 146 feet above excavation . Crest length : 2,603 feet . Crest elevation : 3137.5 . Volume : 1,600,000 cubic yards . Slopes ...
... blanket on upstream face , rockfill on downstream face . Dimensions : Height : 103 feet above streambed , 146 feet above excavation . Crest length : 2,603 feet . Crest elevation : 3137.5 . Volume : 1,600,000 cubic yards . Slopes ...
Page ii
... blanket . 55 57 58 58 57. Sheet steel piling cutoffs . 59 3. Mechanical and Electrical Equipment 60 . 58. Radial gates and hoists . 59. Ice prevention system Electrical installation 60 63 64 ii CONTENTS ( Continued ) Page C. Outlet ...
... blanket . 55 57 58 58 57. Sheet steel piling cutoffs . 59 3. Mechanical and Electrical Equipment 60 . 58. Radial gates and hoists . 59. Ice prevention system Electrical installation 60 63 64 ii CONTENTS ( Continued ) Page C. Outlet ...
Page iv
... blanket 106 100 . Riprap 107 B. Concrete Work 101 . Aggregates . 109 102 . Cement 112 103 . Reinforcement bars . 113 104 . Batching facilities 113 105 . Forms 115 106 . Mixing and placing 117 107 . Concrete control 120 · 108 . Concrete ...
... blanket 106 100 . Riprap 107 B. Concrete Work 101 . Aggregates . 109 102 . Cement 112 103 . Reinforcement bars . 113 104 . Batching facilities 113 105 . Forms 115 106 . Mixing and placing 117 107 . Concrete control 120 · 108 . Concrete ...
Page vi
... blanket . 10. Drainage well and test shafts . . 11. Enders Dam -- General plan and sections 12. Dike plan and sections 13. Routing of design flood through spillway equipped with automatically controlled gates 14. Routing of design flood ...
... blanket . 10. Drainage well and test shafts . . 11. Enders Dam -- General plan and sections 12. Dike plan and sections 13. Routing of design flood through spillway equipped with automatically controlled gates 14. Routing of design flood ...
Page 13
... blanket were designed . B. Materials 18. Materials Explorations . - Explorations for earth materials were carried out in three phases -- preliminary , preconstruction , and construction . Investigations were initiated in October 1944. A ...
... blanket were designed . B. Materials 18. Materials Explorations . - Explorations for earth materials were carried out in three phases -- preliminary , preconstruction , and construction . Investigations were initiated in October 1944. A ...
Common terms and phrases
12 inches abutment cutoff acre-feet Axis backfill berm blanket blockout borrow areas borrow pit Bureau of Reclamation CAMBRIDGE UNIT cemented centers chute compacted conduit construction contractor counterforts cubic yards cutoff trench cutoff wall dam and dike Denver depth discharge downstream end drainage driving Dumped riprap embankment Enders Dam floor slab Frenchman Creek gate chamber Graded sand guardrails impervious material inlet installation irrigation layer left abutment load located loess Nebr Nebraska State Highway needle valve Ogallala formation operation Order for Changes Original ground surface outlet works stilling percent pervious piers Piezometer placed pounds protection radial gates reinforced Republican River required excavation reservoir reservoir water right abutment riprap rock rockfill sand and gravel SAND ZONE SCALE OF FEET second-feet seepage shown on figure silt silty specifications spillway floor spillway stilling basin station Steel sheet piling storage test shaft thickness toe drain unit upstream valve house water curing wing wall
Popular passages
Page 5 - Stat. 641) authorized a general comprehensive plan for the conservation, control and use of the water resources of the Missouri River Basin...
Page 61 - Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for...
Page 6 - ... of affected Federal agencies. These drafts were reviewed by the two States and at field level by the following agencies: Department of Agriculture: Forest Service Soil Conservation Service Department of the Army, Corps of Engineers Federal Power Commission Department of the Interior: Bureau of Mines Bureau of Land Management Fish and Wildlife Service Geological Survey National Park Service DESCRIPTION OF AREA 6. Physical features. — Two distinct areas are involved in the project. They are separated...
Page 49 - A trench cross-sectioning the feature revealed that the ditch had inward sloping walls and was originally 3 feet wide at the top and 1 foot wide at the bottom.
Page 124 - Laboratory Tests of Concrete Aggregate and Riprap, Medicine Creek Dam and Enders Dam, Frenchman-Cambridge Unit, Missouri River Basin Project,
Page 12 - Silts are chalky and brown, and contain thin sand seams. Clays are moderately plastic, brown, red or grey, sandy, Sfid slightly calcareous.
Page 1 - Enders reservoir is approximately 1 mile wide and extends 5 miles upstream from the base of the dam. The reservoir has a storage capacity of...