River and Harbour, Flood Control, and Beach Erosion Control Projects in Hawaii, Report ... by Stephen M. Young, Chairman, Subcommittee on Flood Control - Rivers and Harbors, a Special On-site Inspection Made on November 18-23, 1968, December 19681968 - 96 pages |
From inside the book
Results 1-5 of 20
Page 10
... proposed deep - draft harbor at Barbers Point is projected to total approximately 680,000 tons in 1970 , 940,000 tons in 1980 , and 1,700,000 tons in 2020 . The project was authorized by the River and Harbor Act of October 27 , 1965 ...
... proposed deep - draft harbor at Barbers Point is projected to total approximately 680,000 tons in 1970 , 940,000 tons in 1980 , and 1,700,000 tons in 2020 . The project was authorized by the River and Harbor Act of October 27 , 1965 ...
Page 12
... proposed by this study consisted of realining 4,950 feet of the lower reach of the stream , and deepening and widening the next 480 feet of the stream . The proposed channel was concrete - lined and trapezoidal in shape with base widths ...
... proposed by this study consisted of realining 4,950 feet of the lower reach of the stream , and deepening and widening the next 480 feet of the stream . The proposed channel was concrete - lined and trapezoidal in shape with base widths ...
Page 13
... proposed proj- ect , had a population of 4,844 in 1960. The Auau Channel between west Maui and the island of Lanai , often called Lahaina Roads , is relatively calm most of the year and affords one of Hawaii's best recreational boating ...
... proposed proj- ect , had a population of 4,844 in 1960. The Auau Channel between west Maui and the island of Lanai , often called Lahaina Roads , is relatively calm most of the year and affords one of Hawaii's best recreational boating ...
Page 14
... proposed a plan of improvement which would alleviate the present undesirable conditions and increase the berth- ing area to 16.6 acres with a capacity of about 260 craft . The recommended plan of improvement provides for an entrance ...
... proposed a plan of improvement which would alleviate the present undesirable conditions and increase the berth- ing area to 16.6 acres with a capacity of about 260 craft . The recommended plan of improvement provides for an entrance ...
Page 18
... proposed harbor modifications will open it to vessels of the jumboized C - 4 and modified T - 2 - class vessels , and shipping interests have indi- cated that they will begin use of these larger vessels as soon as the harbor will safely ...
... proposed harbor modifications will open it to vessels of the jumboized C - 4 and modified T - 2 - class vessels , and shipping interests have indi- cated that they will begin use of these larger vessels as soon as the harbor will safely ...
Common terms and phrases
1st cost 35 feet deep acres AIEA approximately ARMY ENGINEER DISTRICT Barbers Point BEACH EROSION CONTROL BERTHING AREA BREAKWATER coast construction CORPS OF ENGINEERS deep-draft harbor DEPTH drainage basin dredged ENGINEERS CORPS entrance channel existing FEDERAL PROJECT feet long FEET U. S. ARMY feet wide Flood Control Act funds GROIN HALEIWA HANALEI HANAPEPE Harbor Act harbor basin Hawaii HAWAII REVISED 30 Hilo Harbor Honokahau HONOLULU CORPS Honolulu Harbor island of Hawaii ISLAND OF KAUAI island of Oahu KAHULUI KAILUA Kaneohe Kauai KAUNAKAKAI Kawaihae Kihei KULIOUOU Lahaina LEVEE Light-Draft Vessels LOCATION MAP ISLAND main access channel Maui MOLOKAI Oahu plan of improvement Port Allen project drawing project was authorized provides REVETTED MOLE REVISED 30 JUNE River and Harbor SCALE IN FEET SCALE IN MILES seaward slope SMALL BOAT HARBOR square miles STONE TYPICAL SECTION U. S. ARMY U. S. ARMY ENGINEER WAIANAE Wailua River Wailuku WAIMEA WAIPAHU Waipio width
Popular passages
Page 57 - A reconnaissance study, conducted under the authority of Section 205 of the 1948 Flood Control Act, was completed in November 1957.
Page 53 - Congress, but which are being studied under the authority of section 205 of the Flood Control Act of 1948.
Page ii - Alaska B. EVERETT JORDAN, North Carolina DANIEL K. INOUYE, Hawaii BIRCH BAYH, Indiana JOSEPH M. MONTOYA, New Mexico JOSEPH D.
Page 6 - The tidal range between mean lower low water and mean higher high water is about 1.8 feet and the extreme tidal range is about 4 feet.
Page 45 - Point, a 1,300-acre tract zoned for noxious industry has developed into a large-scale industrial complex. More than 30 firms have bought or leased land for new plants or facilities at this industrial park and a considerable number of other companies have evidenced interest in locating there. By...
Page 45 - ... be founded on the Island of Oahu outside the environs of metropolitan Honolulu. By mid-1963, over $84,800,000 had been invested in site development and plant construction for heavy, medium and light industries occupying approximately 650 acres. Basic industries to be served by the proposed harbor include a major oil refinery, a steel mill, and a cement plant.
Page 6 - ... south side of Kapalama Channel and Basin. HARBOR AND CHANNEL IMPROVEMENTS BY THE UNITED STATES The existing project for Honolulu Harbor, authorized by the River and Harbor Acts of March 3, 1905, August 8, 1917, July 3, 1930, September 3, 1954, and October 27, 1965, provided for the following work: 1.
Page 76 - This provides for a rubble-mound breakwater about 2,150 feet in length along the reef which separates this bay into an inner and an outer harbor ; for an entrance channel 35 feet deep with a minimum width of 600 feet and a length of about 2,400 feet...
Page 1 - ... Territory, called the Paradise of the Pacific, succeeded In Its long campaign for statehood In 1959, becoming the 50th state after being voted in by the United States Senate and House. By plebiscite June 27, Hawaii voted to Join the Union by a vote of 132,773 to 7,971. President Eisenhower on Aug.
Page 49 - Pass under Section 107 of the 1960 River and Harbor Act, as amended.