Page 19
... eastern end and occupies both sides of the Hoquiam River for about 21⁄2 miles above its mouth . Aberdeen adjoins Hoquiam on the east and is built mainly on the north side of Chehalis River and on both sides of the Wishkah River , which ...
... eastern end and occupies both sides of the Hoquiam River for about 21⁄2 miles above its mouth . Aberdeen adjoins Hoquiam on the east and is built mainly on the north side of Chehalis River and on both sides of the Wishkah River , which ...
Page 3
... East Basin 150 feet below the Piston Post Road , for an extension of this channel 300 feet to the ward , and for an anchorage area in the East Basin near the head avigation . The project has been completed . The cost of work der this ...
... East Basin 150 feet below the Piston Post Road , for an extension of this channel 300 feet to the ward , and for an anchorage area in the East Basin near the head avigation . The project has been completed . The cost of work der this ...
Page 7
... East At and West Basins . " Under the existing project for improvement a channel 10 feet deep and from 100 to 80 feet wide is provided to the head of the East Basin , with a small anchorage area at its head . The ost of new work of ...
... East At and West Basins . " Under the existing project for improvement a channel 10 feet deep and from 100 to 80 feet wide is provided to the head of the East Basin , with a small anchorage area at its head . The ost of new work of ...
Page 3
... East Basin 150 feet below the Bon Post Road , for an extension of this channel 300 feet to the ward , and for an anchorage area in the East Basin near the head avigation . The project has been completed . The cost of work der this and ...
... East Basin 150 feet below the Bon Post Road , for an extension of this channel 300 feet to the ward , and for an anchorage area in the East Basin near the head avigation . The project has been completed . The cost of work der this and ...
Page 8
... East Basin near the head of the harbor , from which the main line of the Nev York , New Haven & Hartford Railroad and the urban line of the Nev York , Westchester & Boston Railway are about one - half mile distan to the northwest . This ...
... East Basin near the head of the harbor , from which the main line of the Nev York , New Haven & Hartford Railroad and the urban line of the Nev York , Westchester & Boston Railway are about one - half mile distan to the northwest . This ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet 25 feet Anacostia River annual maintenance annually for maintenance Aransas Pass barges benefits Board of Engineers breakwater bridge canal Chief of Engineers Committee on Rivers Congress construction Corpus Christi Creek cubic yards deep at mean deep water deepening district engineer division engineer draft dredging east branch Engineers for Rivers entrance channel estimated cost existing project extending Federal feet long fishing freight Grays Harbor Harbor Act Harbor Island House Document House of Representatives increased interests Lake Michigan Little Wicomico River located mean low water miles mouth navigation Neches River outer harbor pier Point Port Aransas Port Arthur Port Lavaca Potomac River present Railroad report under review review the reports Rivers and Harbors Sabine Pass Sag Harbor savings ships shoal shore Sturgeon Bay submitted survey terminal tidal tonnage traffic turning basin Turtle Bayou United vessels Washington Washington Channel waterway wharf wharves widening
Popular passages
Page 17 - Senate, That the Board of Engineers for Rivers and Harbors, created under section 3 of the River and Harbor Act, approved June 13, 1902, be and is hereby requested to review the report of the Chief of Engineers on the Ouachita River and tributaries, Arkansas and Louisiana, submitted as Senate Document No.
Page 44 - ... 3. After due consideration of these reports, I concur in the views and recommendations of the Board.
Page 4 - Resolved by the Committee on Rivers and Harbors of the House of Representatives, United States, That the Board of Engineers for Rivers and Harbors created under section 3 of the River and Harbor Act, approved June 13...
Page 15 - February 9, 1934, requested the Board of Engineers for Rivers and Harbors to review the reports on the Sacramento, San Joaquin, and Kern Rivers, Calif., submitted in House Document No.
Page 25 - Resolved by the Committee on Public Works of the United States Senate, That the Board of Engineers for Rivers and Harbors, created under Section 3 of the Rivers and Harbors...
Page 21 - December 6, 1941, and prior reports, with a view to determining if it is advisable to modify the existing project in any way at this time.
Page 17 - Above this point the bayou has a depth of 16 feet for o\ miles, 8 feet for 5 miles more, and 4 feet for 7 miles farther. The present project, as adopted by the river and harbor act of June 25. 1910. calls for dredging a channel 4 feet deep and 50 feet wide from the mouth of Turtle Bayou across Turtle Bay to the foot of Browns Pass, near Anahuac. at a cost of $10,000.
Page 10 - March 2, 1945, provided that in lieu of conditions heretofore prescribed, local interests shall furnish, free of cost to the United States, suitable areas for the disposal of dredged materials...
Page 11 - And if the consideration of such works and projects the Board shall have in view the amount and character of commerce Existing or reasonably prospective, which will be benefited by the improvement and the relations of the ultimate cost of such work, both as to the cost of construction and maintenance, to the public commercial interests involved...
Page 4 - All depths are referred to mean lower low water. The tidal range between mean lower low water and mean higher high water at the...