Document [59th-75th Congress] ...U.S. Government Printing Office - Harbors |
From inside the book
Results 1-5 of 100
Page 4
... June 26 , 1934 - Subject : Columbia River , between mouth of Willamette River and point 1 mile above Vancouver , Wash . To : The Chief of Engineers , United States Army . 1. This report is submitted in response to the following ...
... June 26 , 1934 - Subject : Columbia River , between mouth of Willamette River and point 1 mile above Vancouver , Wash . To : The Chief of Engineers , United States Army . 1. This report is submitted in response to the following ...
Page 8
... June , and July , the river rises to an average crest of 21 feet , at which time the discharge is about 680,000 second - feet . During low - water stages the tidal range is from 1.5 to 2.5 feet . Two bridges cross the Columbia River at ...
... June , and July , the river rises to an average crest of 21 feet , at which time the discharge is about 680,000 second - feet . During low - water stages the tidal range is from 1.5 to 2.5 feet . Two bridges cross the Columbia River at ...
Page 4
... June 26 , 1934 . To : The Chief of Engineers , United States Army . 1. This report is submitted in response to the following resolution adopted September 25 , 1933 : " Resolved by the Committee on Rivers and Harbors of the House of ...
... June 26 , 1934 . To : The Chief of Engineers , United States Army . 1. This report is submitted in response to the following resolution adopted September 25 , 1933 : " Resolved by the Committee on Rivers and Harbors of the House of ...
Page 14
... June 13 , 1902 , be , and is hereby , requested to review the reports on Grays Harbor , Wash . , submitted in House Document Numbered 53 , Seventy - third Congress , first session , with a view to determining the advisability of , first ...
... June 13 , 1902 , be , and is hereby , requested to review the reports on Grays Harbor , Wash . , submitted in House Document Numbered 53 , Seventy - third Congress , first session , with a view to determining the advisability of , first ...
Page 16
... June 1933 except in the dredged channel where on October 3 , 1933 , there was a channel 30 feet deep by 400 feet wide . As shown by the survey of June 1933 depths over the southerly segment of the bar vary from 18 feet to 23 feet ...
... June 1933 except in the dredged channel where on October 3 , 1933 , there was a channel 30 feet deep by 400 feet wide . As shown by the survey of June 1933 depths over the southerly segment of the bar vary from 18 feet to 23 feet ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet 25 feet Anacostia River annual maintenance annually for maintenance Aransas Pass barges benefits Board of Engineers breakwater bridge canal Chief of Engineers Committee on Rivers Congress construction Corpus Christi Creek cubic yards deep at mean deep water deepening district engineer division engineer draft dredging east branch Engineers for Rivers entrance channel estimated cost existing project extending Federal feet long fishing freight Grays Harbor Harbor Act Harbor Island House Document House of Representatives increased interests Lake Michigan Little Wicomico River located mean low water miles mouth navigation Neches River outer harbor pier Point Port Aransas Port Arthur Port Lavaca Potomac River present Railroad report under review review the reports Rivers and Harbors Sabine Pass Sag Harbor savings ships shoal shore Sturgeon Bay submitted survey terminal tidal tonnage traffic turning basin Turtle Bayou United vessels Washington Washington Channel waterway wharf wharves widening
Popular passages
Page 17 - Senate, That the Board of Engineers for Rivers and Harbors, created under section 3 of the River and Harbor Act, approved June 13, 1902, be and is hereby requested to review the report of the Chief of Engineers on the Ouachita River and tributaries, Arkansas and Louisiana, submitted as Senate Document No.
Page 44 - ... 3. After due consideration of these reports, I concur in the views and recommendations of the Board.
Page 4 - Resolved by the Committee on Rivers and Harbors of the House of Representatives, United States, That the Board of Engineers for Rivers and Harbors created under section 3 of the River and Harbor Act, approved June 13...
Page 15 - February 9, 1934, requested the Board of Engineers for Rivers and Harbors to review the reports on the Sacramento, San Joaquin, and Kern Rivers, Calif., submitted in House Document No.
Page 25 - Resolved by the Committee on Public Works of the United States Senate, That the Board of Engineers for Rivers and Harbors, created under Section 3 of the Rivers and Harbors...
Page 21 - December 6, 1941, and prior reports, with a view to determining if it is advisable to modify the existing project in any way at this time.
Page 17 - Above this point the bayou has a depth of 16 feet for o\ miles, 8 feet for 5 miles more, and 4 feet for 7 miles farther. The present project, as adopted by the river and harbor act of June 25. 1910. calls for dredging a channel 4 feet deep and 50 feet wide from the mouth of Turtle Bayou across Turtle Bay to the foot of Browns Pass, near Anahuac. at a cost of $10,000.
Page 10 - March 2, 1945, provided that in lieu of conditions heretofore prescribed, local interests shall furnish, free of cost to the United States, suitable areas for the disposal of dredged materials...
Page 11 - And if the consideration of such works and projects the Board shall have in view the amount and character of commerce Existing or reasonably prospective, which will be benefited by the improvement and the relations of the ultimate cost of such work, both as to the cost of construction and maintenance, to the public commercial interests involved...
Page 4 - All depths are referred to mean lower low water. The tidal range between mean lower low water and mean higher high water at the...