Page 7
... dike across the old mouth of the creek ; for a channel 12 feet deep at mean low water and 100 feet wide from Delaware River to Strathmann sand plant about 2 miles above the mouth ; thence 10 feet deep and 60 feet wide to Friars Landing ...
... dike across the old mouth of the creek ; for a channel 12 feet deep at mean low water and 100 feet wide from Delaware River to Strathmann sand plant about 2 miles above the mouth ; thence 10 feet deep and 60 feet wide to Friars Landing ...
Page 13
... dike across the old mouth without increase in total cost . 11. A preliminary examination and survey was authorized by the River and Harbor Act of March 3 , 1909. The improvement then recommended was for dredging a channel 6 feet deep ...
... dike across the old mouth without increase in total cost . 11. A preliminary examination and survey was authorized by the River and Harbor Act of March 3 , 1909. The improvement then recommended was for dredging a channel 6 feet deep ...
Page 14
... dike across the old mouth . 15. The total cost of the existing and previous projects on Mantua Creek , to June 30 , 1936 , was $ 112,958.52 for new work and $ 72,112.70 for maintenance , a total expenditure of $ 185,071.22 . The present ...
... dike across the old mouth . 15. The total cost of the existing and previous projects on Mantua Creek , to June 30 , 1936 , was $ 112,958.52 for new work and $ 72,112.70 for maintenance , a total expenditure of $ 185,071.22 . The present ...
Page 42
... dike section on the Oklahoma side , the crest elevation of which is 687 . The reservoir , either designed solely for flood control or for flood control initially but with provisions for future power facilities , would have its spillway ...
... dike section on the Oklahoma side , the crest elevation of which is 687 . The reservoir , either designed solely for flood control or for flood control initially but with provisions for future power facilities , would have its spillway ...
Page 45
... dike across the lower portion of the Oklahoma Plateau . The project plan as designed for the combined flood control and power - development scheme with top of dam at elevation 695 is based upon the following allocation of reservoir ...
... dike across the lower portion of the Oklahoma Plateau . The project plan as designed for the combined flood control and power - development scheme with top of dam at elevation 695 is based upon the following allocation of reservoir ...
Other editions - View all
Common terms and phrases
100 feet wide 20 feet acre-feet acres Amelia River annual cost Augustine average beach benefits Board of Engineers breakwater Bridge capacity Chief of Engineers coast commerce construction Corps of Engineers cubic yards deep at mean dike district engineer division engineer dredging east Eau Gallie elevation Engineers for Rivers erosion estimated cost Everett Harbor existing project facilities feet deep feet long feet per second flood control highway improvement increase inlet interests Intracoastal Waterway irrigation jetties kilowatts lands located lower low water mean low water mean lower low miles mouth Mystic River navigation operation Oregon City percent plant Point Port Everglades power development present recommends Red River Rivers and Harbors sand Santa Barbara Santiam shoaling shore line Skagway Skagway River Snohomish River storage survey terminal tion tons traffic tributaries turning basin U.S. ARMY Unalaska United vessels wharf width Willamette River Willoughby Spit
Popular passages
Page 15 - States, all lands, easements, and rights-of-way necessary for construction of the project, hold and save the United States free from damages due to the construction works, and maintain and operate all the works after completion in accordance with regulations prescribed by the Secretary of the Army.
Page 14 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 7 - Resolved by the Committee on Public Works of the United States Senate, That the Board of Engineers for Rivers and Harbors, created under section 3 of the River and Harbor Act, approved June 13, 1902, be and is hereby requested to review the report of the Chief of Engineers on the Ouachita River and tributaries, Arkansas and Louisiana, submitted as Senate Document No.
Page 11 - Resolved by the Committee on Rivers and Harbors of the House of Representatives, United States, that the Board of Engineers for Rivers and Harbors created under section 3 of the River and Harbor Act, approved June 13...
Page 4 - ... 3. After due consideration of these reports, I concur in the views and recommendations of the Board.
Page 1 - Letter from the Secretary of War, transmitting a letter from the Chief of Engineers, US Army, dated April 8, 1946, submitting a report, together with accompanying papers and illustrations, on a preliminary examination and survey of Clinton River, Mich., authorized by the Flood Control Act approved on August 28, 1937, known as House Document No.
Page 11 - That the Secretary of War is hereby authorized to receive from private parties such funds as may be contributed by them to be expended in connection with funds appropriated by the United States for any authorized work of public improvement of rivers and harbors, whenever such work and expenditure may be considered by the Chief of Engineers as advantageous to the interests of navigation.
Page 8 - The Secretary of War is hereby authorized and directed to cause preliminary examinations and surveys to be made at the following-named localities...
Page 1 - To: The Secretary of War. 1. I submit, for transmission to Congress, my report with accompanying papers and illustrations on Columbia River and minor tributaries, made under the provisions of House Document No.
Page 2 - ... for a channel 28 feet deep at mean low water from deep water in the Atlantic Ocean to deep water at the junction of Lanceford Creek with Amelia River...