Mississippi River Flood Control, Morganza Floodway: Hearings Before the Committee on Commerce, United States Senate, Seventy-fifth Congress, Third Session on S. 3354, a Bill to Amend the Act Entitled "An Act to Amend the Act Entitled 'An Act for the Control of Floods on the Mississippi River and Its Tributaries ... " |
From inside the book
Results 1-5 of 21
Page 7
... extend- ing from the head of the Morganza floodway to the head of and down the east bank of the Atchafalaya River to the intersection of said Morganza floodway until 75 per centum of the value of the flowage rights and the rights - of ...
... extend- ing from the head of the Morganza floodway to the head of and down the east bank of the Atchafalaya River to the intersection of said Morganza floodway until 75 per centum of the value of the flowage rights and the rights - of ...
Page 23
... extend- ing down through the Atchafalaya floodways , divide the State of Louisiana into two parts , and that the proposed floodways go right through from the northeastern portion down to the southwestern portion of Louisiana ? Governor ...
... extend- ing down through the Atchafalaya floodways , divide the State of Louisiana into two parts , and that the proposed floodways go right through from the northeastern portion down to the southwestern portion of Louisiana ? Governor ...
Page 36
... extend upstream so far as the other work of enlarging the river continues . Five hundred thousand second - feet would mean a lowering of the gage above the outlet by 500,000 divided by about 70,000 or 80,000 ; that is , if you lowered ...
... extend upstream so far as the other work of enlarging the river continues . Five hundred thousand second - feet would mean a lowering of the gage above the outlet by 500,000 divided by about 70,000 or 80,000 ; that is , if you lowered ...
Page 41
... extension , so - called , in Arkansas ? Have you separated those ? Brigadier General FERGUSON . I do not know , sir . That is one of our most difficult problems . We had people owning land in that area that was flooded once in 12 years ...
... extension , so - called , in Arkansas ? Have you separated those ? Brigadier General FERGUSON . I do not know , sir . That is one of our most difficult problems . We had people owning land in that area that was flooded once in 12 years ...
Page 42
... extend that levee and actually give that section of the valley complete protection . Senator MILLER . You mean , extend ... extension , that is all we care about . Brigadier General FERGUSON . I can see that ; but the question- Senator ...
... extend that levee and actually give that section of the valley complete protection . Senator MILLER . You mean , extend ... extension , that is all we care about . Brigadier General FERGUSON . I can see that ; but the question- Senator ...
Other editions - View all
Common terms and phrases
75 percent acres ALLEN alluvial valley Angola Arkansas City Arkansas River Atchafalaya Basin Atchafalaya River authorized back protection levee Baton Rouge Bonnet Carre Brigadier General FERGUSON built capacity carry Chairman Chief of Engineers committee condemnation Congress construction cubic feet cut-offs diversion easements Eudora floodway Eudora spillway feet per second flowage easements flowage rights freeboard fuse fuseplug levee gage give Government Governor LECHE grade and section GRUBS HAMLEY HEBERT JACOBS KLORER land levee board levee district Louisiana Louisiana line Major General SCHLEY middle section miles Mississippi River Commission Morganza floodway Morganza spillway Natchez necessary Orleans Overton Act Overton bill Parish plug Pointe Coupee Parish police jury problem question Red River Representative WHITTINGTON reservoirs rights-of-way Senator BILBO Senator MILLER Senator OVERTON Senator OVERTON presiding Senator SHEPPARD side statement SUMMERLIN superflood tion Total number Total value United Vicksburg West Atchafalaya
Popular passages
Page 2 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 1 - That the following sums of money be, and are hereby, appropriated, to be paid out of any money in the Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 10 - An Act for the control of floods on the Mississippi River and its tributaries, and for other purposes...
Page 3 - The 1928 act authorized $5,000,000 which has been exhausted and the 1936 act authorized $15,000,000 to replenish these funds to be allocated by the Secretary of War on the recommendation of the Chief of Engineers in rescue work or in the repair and maintenance of any flood-control work on any tributaries of the Mississippi River threatened or destroyed by flood heretofore or hereafter occurring.
Page 2 - That hereafter no money appropriated under authority of this Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War...
Page 165 - Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That the project for the flood control of the Mississippi River in its alluvial valley...
Page 165 - The plan is a comprehensive one, providing for the maximum flood predicted as possible, and for future expansion to meet changing conditions. It includes a spillway above New Orleans, diversion floodways in the Atchafalaya and Tensas Basins, a river bank floodway from Cairo, Illinois, to New Madrid, Missouri, together with strengthening and a moderate raising of existing levees.
Page 2 - River, hereby authorized, shall be undertaken until the States, or other qualified agencies, shall have furnished satisfactory assurances that they will undertake, without cost to the United States, all alterations of highways made necessary because of the construction of the authorized reservoirs, and meet all damages because of such highway alterations, and have agreed also to furnish without cost to the United States all lands and easements necessary to the construction of levees and drainage...
Page 2 - Chiaf of Engineers, with the approval of the Secretary of War, may modify the project for the flood control of the Saint Francis River as recommended in said report, to include therein the construction of a detention reservoir for the reduction of floods, and the acquisition at the cost of the United States of all lands and flowage necessary to the construction of said reservoir except flowage of highways...
Page 3 - States free from damages due to the construction works; (c) maintain and operate all the works after completion in accordance with regulations prescribed by the Secretary of the Army...